Taylor-Wharton XL-45HP Скачать руководство пользователя страница 12

VENT TEE CHART

The vent tee chart connects to a transfer hose to complete a fill line kit. Each assembly

includes a 3/8 in. pipe connector to CGA fitting with a 350 psig (24 bar/2413 kPa) relief

valve, and a ball-type dump valve.

Service

CGA Connection

Part Number

Inert (N

2, 

Ar)CGA 295

GL50-8C60

Read the Safety Precautions in the front of this manual before attempting any repairs on

these containers. Also follow these additional safety guidelines while performing con-

tainer maintenance.

Never work on a pressurized container.

 Open the vent valve as a standard practice

during maintenance to guard against pressure build-up from residual liquid.

Use only repair parts cleaned for oxygen service.

 Be certain your tools are free of oil

and grease. This is a good maintenance practice, and helps ensure you do not create a

combustion hazard when working on containers for oxygen or nitrous oxide service.

Leak test connections after every repair.

 Pressurize the container with an appropriate

inert gas for leak testing. Use only approved leak test solutions and follow the manufacturer’s

recommendations. “Snoop” Liquid Leak Detector is one approved solution, it is available

from: Nupro Co., 4800 E. 345

th

 St., Willoughby, Ohio, 44094 U.S.A.

CONVERTING A CONTAINER TO A DIFFERENT GAS SERVICE

XL-45HP/50HP/55HP/50VHP cylinders may be converted from one service to another

within the confines of the argon, carbon dioxide, nitrogen, nitrous oxide, and oxygen

service for which the containers are designed. Conversion consists of changing end con-

nections at the USE, LIQUID and VENT valves; then changing the liquid level gauge scale

by changing its plastic cover; and revising product decals. Parts are available in kit form

for each gas service as illustrated in the following table.

Service Change Procedure

Before removing any parts, empty the container and open the vent valve to prevent any

pressure build-up in the unit.

1. Remove the LIQUID, VENT and USE end fittings, one at a time, with standard wrenches.

Install new fittings from the Gas Service Change Kit, using Teflon tape or another

oxygen-compatible thread sealant.

2. Remove the protective cover over the liquid level gauge. Replace the contents scale

with the scale for the new gas service from the service change kit, then replace the

protective cover.

3. Install new fittings for the USE, VENT and LIQUID connections from the Gas Service

Change Kit. Leak test the fittings you just replaced, and change the gas service de-

cals to complete the conversion.

WARNING:

Never put any liquid

cylinder into another

service once it has

been in CO

2

 service.

MAINTENANCE

PROCEDURES

WARNING:

For O

2

 users: Residue

of leak detectors

solutions can be

flammable.  All

surfaces to which the

leak detector solutions

have  been  applied

must be adequately

rinsed with potable

water to remove all

traces of residue.

Reference CGA G-4,

Section 5.9

CAUTION:

Carbon dioxide may

form into the solid

phase (dry ice) if the

pressure of the liquid

is allowed to drop

below 70 psig (4.8 bar/

483 kPa). Pressure in

the container must be

maintained above this

value to ensure a solid

block of CO

2

 will not

form inside the

container. Before

performing

maintenance on an

XL-45HP/50HP/55HP/

50VHP in CO

2

 service,

the contents must be

transferred to another

container so that

container pressure

can be released.

12

Содержание XL-45HP

Страница 1: ...gulator Do not attempt to use or maintain this unit until you read and understand these instructions Do not permit untrained persons to use or maintain this unit If you do not fully understand these i...

Страница 2: ...if used in oxygen or nitrous oxide service although they may be acceptable for use with other cryogenic liq uids Use only Taylor Wharton recommended spare parts and be certain parts used on oxygen or...

Страница 3: ...cfh 2 9 cu m h 110 cfh 2 9 cu m h 110 cfh 2 9 cu m h N A ReliefValveSetting 350 psig 350 psig 350 psig 500 psig 24 bar 2413 kPa 24 bar 2413 kPa 24 bar 2413 kPa 34 bar 3447 kPa Inner Container Bursting...

Страница 4: ...tion q When loading or unloading the container from a truck use a hand truck lift gate crane or parallel loading dock Never attempt to manually lift the unit q To move the container over rough surface...

Страница 5: ...a mean of introducing heat from outside the container s insulated jacket to vaporize liquid as gaseous product is withdrawn The capacity of this circuit is sufficient to vaporize at flow rates up to...

Страница 6: ...re quired CGA connection that matches the gas service for which the container is configured The LIQUID Valve Liquid product is added or withdrawn from the container through the connection controlled b...

Страница 7: ...icator band This gauge is an indication of approximate container contents only and should not be used for filling liquid cylinders should be filled by weight Relief Devices These cylinders have a gas...

Страница 8: ...capacity is required an ac cessory external vaporizer is available When an external vaporizer is sued it must be connected to the USE valve and the regulator moved to the output of the external vapor...

Страница 9: ...ainer is being filled with CO2 it may be necessary to pressurize the container with gaseous CO2 before beginning the fill Pressure Transfer Filling Method Filling a liquid cylinder using the pressure...

Страница 10: ...to the VENT valve on the cylinder Both the fill line and the container should be pre cooled prior to beginning the fill process Proper full weight is determined by the previ ously explained method 1 O...

Страница 11: ...ervice Hose Length Connections s Fittings Number Inert N2 Ar Service 4ft 1 2m StainlessSteel LIQUID or VENT Valve CGA 295 to 3 8 in NPT 1700 9C65 6ft 1 8m StainlessSteel LIQUID or VENT Valve CGA 295 t...

Страница 12: ...and VENT valves then changing the liquid level gauge scale by changing its plastic cover and revising product decals Parts are available in kit form for each gas service as illustrated in the followi...

Страница 13: ...the change REGULATOR ADJUSTMENT RANGES Part No Normal Setting Range Delta 8816 1060 400 psig 300 to 600 psig 28 bar 20 7 to 41 bar 2758 kPa 2068 to 4137 kPa 6999 9018 300 psig 200 to 350 psig 20 psig...

Страница 14: ...roceeding 2 Close the on off valve and the Dump valve 3 Slightly open the high pressure cylinder valve 4 Set the high pressure regulator above the desired set point for the Pressure Building setpoint...

Страница 15: ...ill not hold liquid NER Testing If a loss of vacuum integrity is suspected the container s Normal Evaporation Rate NER should be checked The test measures the actual product lost over time so you can...

Страница 16: ...touch the side or bottom of the tube The yellow level indicator of the gauge should indicate a full level reading with the oxygen scale If the gauge fails to indicate a full liquid level the assembly...

Страница 17: ...drop the float rod straight through the guide ring inside the cylinder 4 To confirm that the rod is correctly positioned in the cylinder stop where you can still grasp the top of the rod see illustra...

Страница 18: ...to about 20 ft lbf 2 8 kgf m Leak check the connection of gauge body to the flange CAUTION When installing the gauge assembly care must be taken to ensure that the float rod is inserted through the gu...

Страница 19: ...alve Disassembly Instructions 1 Open valve by turning handwheel counterclockwise as far as it will go to release any trapped gas in the system 2 Using a screwdriver remove Handwheel Screw and Washer b...

Страница 20: ...nnet to 80 ft lbf 11 kgf m torque 6 Install Bonnet Washers over Stem on Bonnet 7 Place Handwheel over Stem on Bonnet 8 Install Seal 6 over Stem into recess of Handwheel 9 Install Seal Washer 5 over Se...

Страница 21: ...on container Use a rubber hammer to drive the rubber shock ring back into place 5 Using a in drill but drill holes through the rubber so that the carriage bolt slides in smoothly 6 The holes in foot r...

Страница 22: ...ce bursting bursting disc disc Pressurize container and check relief valve operation 5 3 Leaks in valves or 3 Leak test and repair leaks plumbing For valve repairs see Maintenance section 4 Cold liqui...

Страница 23: ...e Economizer Regulator set regulator when in use above relief valve setting Economizer side of regulator clogged or stuck open Container vents after This may be caused by Symptom should go away fill b...

Страница 24: ...re AL36590 0568 1 800 898 2657 in USA and Canada Accessories available for use with Taylor Wharton XL Series containers are Manifolds Automatic and Manual Container Hand Trucks Vaporizers adding up to...

Страница 25: ...06 9C14 2 Each 7 Safety Head 525 psig 36 bar 3620 kPa 1705 9C12 2 Each Safety Head 750 psig 52 bar 5171 kPa for XL 50VHP Only 7815 3085 2 Each 8 Relief Valve 500 psig 34 bar 3447 kPa not for C02 for X...

Страница 26: ...oxide 7355 4712 5 Each Decal Carbon Dioxide GL55 9C54 A R Decal Nitrogen GL55 9C51 A R Decal Oxygen GL55 9C52 A R Decal Argon GL55 9C53 A R Decal Nitrous Oxide GL55 9C55 A R Decal Warning 1700 9C07 4...

Отзывы: