5
Ver_2-08-22
ADIR Semi
–
Automatic 2
” filter
TDS
–
Gen2
Installation and maintenance instructions
1 action
Box contents
•
Main filter assembled
–
picture A
•
Valve F/F 1/2" and Nipple M/M
½” –
picture B
•
Pressure indicator kit and fittings
–
picture C
o
Pressure indicator (Picture C-3).
o
Tube 6 mm length 25 cm (Picture C-4).
o
Tube 6 mm length 20 cm (Picture C-5).
o
Connector 1/4"F to 6 mm adaptor x 2 (Picture C-
6)
o
Connector 1/4"F to 6 mm elbow (Picture C-7).
o
Connector 1/4"F to 6 mm adaptor (Picture C-8).
Assembly
•
Connect the valve 1/2" with nipple 1/2
” to
the flush port
outlet (no need to use Teflon, valve is self-seal)
–
(Picture
B).
•
Pressure indicator kit assembly:
o
Connect two adaptors 1/4"F to 6 mm to filter
body top 1/4" outlets.
o
Connect 1/4"F to 6 mm elbow to the bottom of
the indicator (upstream - high pressure).
o
Connect 1/4"F to 6 mm adaptor to side of the
indicator (downstream
–
low pressure).
o
Press fit the indicator to the sockets on the filter
body.
o
Connect 6 mm tube length 25cm from Filter inlet
port to indicator bottom (marked "+").
o
Connect 6 mm tube length 20 cm from Filter
outlet port to indicator side (marked "-").
o
Hydraulic fittings may require Teflon to seal.
•
Filter is ready for installation (Picture D)
Installation
•
Filter can be installed in vertical position or at 90° to the
pipe, (Bottom of the cup
pointing down or to the side).
•
Ensure proper flow direction as clearly marked on the
filter.
•
Make sure valve 1/2" is closed.
•
It is recommended to install a shut off inlet valve before
the filter for maintenance.
•
Filter is ready for first operation
740mm
A
645mm
B
235mm
C
485mm
D
Picture B
Picture C
Picture D
After
assembly
Picture A
Before
assembly