24
Assembly
STEP 6
1. Attach the Down Swing Frame ASSY (#12) and the Up Swing Frame ASSY (#18) to the
Back Floorstand ASSY (#5) using:
two shaft Φ25.4*109 (#30) four M10*25 SHCS (#49)
four Washer Φ36*Φ11*3 (#25)
2. Attach the Adjust Frame ASSY (#11) to the Up Swing Frame ASSY (#18) using:
one shaft Φ25.4*146 (#20) two M10*25 SHCS (#49)
two Washer Φ36*Φ11*3 (#25)
3. Attach the Adjust Frame ASSY (#11) and the Leg Pad Frame ASSY (#9)to the Down
Swing Frame ASSY (#12) using:
one shaft Φ25.4*210.5 (#21) two M10*25 SHCS (#49)
two Washer Φ36*Φ11*3(#25) two Screw M8*6 (#65)
Note: Wrench Tighten Bolts and Nylon Lock Nuts.
Содержание WEIGHT ASSISTED CHIN/DIP COMBO IT95
Страница 8: ...8 Exploded View and Parts List Overall...
Страница 30: ......
Страница 32: ...Assembly 32 STEP 9...
Страница 33: ...Assembly 33 STEP 10...
Страница 36: ......
Страница 40: ......