23
Assembly
STEP 5
1. Attach the Bar ASSY (#10) to the Left Floorstand ASSY (#3) and the Right Floorstand
ASSY (#4) using:
four M10*80 SHCS (#54) eight Φ11*Φ20*2 Flat Washer (#67)
four M10 Nylon Lock Nut (#70)
2. Attach the Long Bar ASSY (#14) to the Left Floorstand ASSY (#3) using:
one M10*16 SHCS (#48) one M10*30 FHCS (#61)
one Caps Φ38*Φ10.5*8 (#26)
3. Attach the Long Bar ASSY (#14) to the Right Floorstand ASSY (#4) using:
one M10*16 SHCS (#48) one M10*30 FHCS (#61)
one Caps Φ38*Φ10.5*8 (#26)
4. Attach two Bottom Bracket ASSY (#32) to the Weight Stack Frame ASSY (#22) using:
two M10*75 SHCS (#53) four Φ11*Φ20*2 Flat Washer (#67)
two M10 Nylon Lock Nut (#70)
5. Attach the Top Bracket ASSY (#31) to the Weight Stack Frame ASSY (#22) using:
two Φ9*Φ16*1.6 Flat Washer (#66) two M8*20 SHCS (#60)
Note: Wrench Tighten Bolts and Nylon Lock Nuts.
Содержание WEIGHT ASSISTED CHIN/DIP COMBO IT95
Страница 8: ...8 Exploded View and Parts List Overall...
Страница 30: ......
Страница 32: ...Assembly 32 STEP 9...
Страница 33: ...Assembly 33 STEP 10...
Страница 36: ......
Страница 40: ......