nents shall include initial safety checks and
component inspection procedures. If a fault
exists that could compromise safety, then no
electrical supply shall be connected to the
circuit until it is satisfactorily dealt with. If the
fault cannot be corrected immediately but it is
necessary to continue operation, an adequate
temporary solution shall be used. This shall be
reported to the owner of the equipment so all
parties are advised.
-
Initial safety checks shall include: that capac
-
itors are discharged: this shall be done in a
safe manner to avoid possibility of sparking;
that there no live electrical components and
wiring are exposed while charging, recovering
or purging the system; that there is continuity of
earth bonding.
REPAIRS TO SEALED COMPONENTS
- During repairs to sealed components, all
electrical supplies shall be disconnected from
the equipment being worked upon prior to any
removal of sealed covers, etc. If it is absolute-
ly necessary to have an electrical supply to
equipment during servicing, then a permanently
operating form of leak detection shall be located
at the most critical point to warn of a potentially
hazardous situation.
- Particular attention shall be paid to the following
to ensure that by working on electrical compo
-
nents, the casing is not altered in such a way
that the level of protection is affected.
- This shall include damage to cables, excessive
number of connections, terminals not made to
original specification, damage to seals, incor
-
rect fitting of glands, etc. Ensure that appara
-
tus is mounted securely. Ensure that seals or
sealing materials have not degraded such that
they no longer serve the purpose of prevent
-
ing the ingress of flammable atmospheres.
Replacement parts shall be in accordance with
the manufacturer’s specifications.
-
NOTE The use of silicon sealant may inhibit the
effectiveness of some types of leak detection
equipment. Intrinsically safe components do not
have to be isolated prior to working on them.
REPAIR TO INTRINSICALLY SAFE
COMPONENTS
-
Do not apply any permanent inductive or ca
-
pacitance loads to the circuit without ensuring
that this will not exceed the permissible voltage
and current permitted for the equipment in
use. Intrinsically safe components are the only
types that can be worked on while live in the
presence of a flammable atmosphere. The
test apparatus shall be at the correct rating.
Replace components only with parts specified
by the manufacturer. Other parts may result
in the ignition of refrigerant in the atmosphere
from a leak.
CABLING
- Check that cabling will not be subject to wear,
corrosion, excessive pressure, vibration, sharp
edges or any other adverse environmental
effects. The check shall also take into account
the effects of aging or continual vibration from
sources such as compressors or fans.
DETECTION OF FLAMMABLE
REFRIGERANTS
- Under no circumstances shall potential sources
of ignition be used in the searching for or
detection of refrigerant leaks. A halide torch (or
any other detector using a naked flame) shall
not be used.
LEAK DETECTION METHODS
- The following leak detection methods are
deemed acceptable for systems contain
-
ing flammable refrigerants. Electronic leak
detectors shall be used to detect flammable
refrigerants, but the sensitivity may not be
adequate, or may need recalibration. (Detection
equipment shall be calibrated in a refriger-
ant-free area.) Ensure that the detector is not
a potential source of ignition and is suitable for
the refrigerant used. Leak detection equipment
shall be set at a percentage of the LFL of the
refrigerant and shall be calibrated to the refrig-
erant employed and the appropriate percentage
of gas (25 % maximum) is confirmed. Leak
detection fluids are suitable for use with most
refrigerants but the use of detergents contain-
ing chlorine shall be avoided as the chlorine
may react with the refrigerant and corrode the
copper pipe-work. If a leak is suspected, all
naked flames shall be removed/extinguished. If
a leakage of refrigerant is found which requires
brazing, all of the refrigerant shall be recovered
from the system, or isolated (by means of shut
off valves) in a part of the system remote from
the leak. Oxygen free nitrogen (OFN) shall then
be purged through the system both before and
during the brazing process.
Downloaded by: pd-oliana on 11-08-2022 08:24 CEST
Содержание PLEASANT WATER PUMP
Страница 2: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 3: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 111: ...FIG 2 1 6 10 c FIG 2 2 3 17 21 2 1 15 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 112: ...pH FIG 3 2 E2 eh E5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 113: ...R290 CO2 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 114: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 115: ...LFL 25 OFN OFN OFN 0 OFN OFN Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 116: ...a b c d e f g h 80 i j k Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 117: ...GG 2 GG 4 GG 5 IEC 60079 15 2010 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 118: ...5 5 5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 119: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 132: ...FIG 2 1 6 10 cm FIG 2 2 3 17 21 2 15 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 133: ...pH FIG 3 2 E2 eh E5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 134: ...R290 CO2 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 135: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 136: ...LFL 25 OFN OFN OFN OFN OFN Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 137: ...a b c d e f g h 80 i j k Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 138: ...GG 2 GG 4 GG 5 IEC 60079 15 2010 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 139: ...5 5 5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 140: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 141: ...51 3 2 E2 eh E5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 144: ...5 5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 145: ...2 GG 4 GG 5 GG 0102 51 97006 CEI 5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 146: ...LFL 52 NFO NFO NFO NFO NFO a b c d e f g 08 h i j k Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 147: ...092R Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 148: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 149: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 155: ...Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 156: ...14 07 2022 www taurus home com Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 171: ...PT O aparelho cont m um g s de refrigera o inflam vel Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 194: ...BG TAURUS ALPATEC 4 m2 R290 90 R290 R290 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 195: ...BG 8 20 20 5TE 5ET 5M 5H 3F 5T 5C 50CT 250VAC T 2A H 250VAC T 3 15A H Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 196: ...BG 10 c a pa o a a e c po c a epe c 30 mA Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 197: ...BG U 2014 35 EU 2014 30 EU 2011 65 U 2009 125 EC Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 198: ...EL TAURUS ALPATEC 4 m2 R290 90 R290 R290 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 200: ...EL 10 30 mA o Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 201: ...EL 2014 35 U 2014 30 U 2011 65 U 2009 125 C Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 205: ...AR WEEE 2014 35 EU 2014 30 EU 2011 65 EU 2009 125 EC Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 207: ...AR TAURUS ALPATEC 2 4 R290 90 R290 R290 Downloaded by pd oliana on 11 08 2022 08 24 CEST...
Страница 208: ...Avda Barcelona s n 25790 Oliana Spain Ver I 07 07 2022 A5 Downloaded by pd oliana on 11 08 2022 08 24 CEST...