71
GNCRP / GNCRPE / GNCRPE 230 - Rev. 03 - Aug/22
6. Set-up instructions
Hitching to the tractor
- The axle (B) and cotter pin are not included with the equipment.
- Hold the cable (C) when carrying out the hitching to the tractor.
NOTE
NOTE
A
A
C
C
B
B
- GNCRP: 32 to 60 disc blades
- GNCRPE: 36 to 60 disc blades
WARNING
- When setting up the equipment for the job, the tractor-equipment must be leveled
related to the soil. Besides that, the tractor must be hitched to the equipment hitch
to avoid unnecessary efforts during the set-up.
- GNCRPE 230 - 28 and 72 disc blades
3. Couple the hitch (A) to the tractor drawbar and lock using an axle (B) and cotter
pin.
4. Note that the drawbar must remain fixed.
1. Check the drawbar type from your tractor. To hitch the equipment, use the tractor
drawbar.
2. The tractor drawbar must always remain fixed and centered during operation.
Содержание GNCRP
Страница 1: ...OPERATOR S MANUAL GNCRP GNCRP GNCRPE GNCRPE GNCRPE 230 GNCRPE 230...
Страница 104: ...www marchesan com br...