48
GNCRP / GNCRPE / GNCRPE 230 - Rev. 03 - Aug/22
5. Assembly
Disc gangs assembly sequence
1. Place the outer lock (A) along with the axle (B).
2. Tight the nut (C) until it passes 5 mm from the axle face.
3. Place a disc blade (D), bearings (E) and spacer spools (F), following the instructions
on the previous pages.
4. Place the inner lock (G) and nut (C1).
5. Place the bolt (H) that fasten the lock nut (I), along with a spring washer and nut
(only on the outer side of the gangs).
6. Use the wrenches from the 'set of wrenches' page and tighten the gangs:
a) Place one of the wrenches on the inner side of the gangs (locked side) and support
it on the soil (as shown on the next page).
b) Use the other wrench on the outer side and tighten the gangs until it reaches the
maximum torque.
c) To tight the gangs, keep them underpinned using a wood or similar object (as
shown on the next page).
7. Lastly, place the bolt (H1) and position the lock nut (I1), fastening it using a spring
washer and nut.
IMPORTANT
- Check the correct side of the bearings and spacer spools according to the disc blades
concavity.
Plug
Plug
DMO bearing
DMO bearing
DM bearing
DM bearing
Plug
Plug
- GNCRP: 64 to 72 disc blades
- GNCRPE 230: 28 to 72 disc blades
Содержание GNCRP
Страница 1: ...OPERATOR S MANUAL GNCRP GNCRP GNCRPE GNCRPE GNCRPE 230 GNCRPE 230...
Страница 104: ...www marchesan com br...