29
I25
I24
I23
I22
I21
I20
I19
I18
I17
I16
tr
sv
sl
pt
pl
no
nl
it
fr
fi
es
en
de
da
cz
Overview
1
Handle
2
Water pump switch (illuminated)
3
Suction motor switch (non-illuminated)
4
Main switch
5
Transport handle, front
6
Tank unlocking device
7
Filter housing
8
Dosing lid
9
Solution tank
10
Recovery tank
11
Brush pressure regulation
12
Unlocking device for brush holder cover
13
Side bumper
14
Squeegee
15
Front bumper
16
Nozzle body
17
Wheels
18
Foot pedal
19
Suction hose
20
Transport handle, rear
21
Hose connection
22
Power supply cord
23
Cable hook
24
Upper cable-winding hook
25
Protective filter fpr pump
26
Suction chasnnel maintenance cover
27
Sponge filter
Preparation for operation/Operation
Electrical circuit diagram
2
5
6
8
11
24
23
21
20
19
7
10
3
4
9
12
13 14 15 16 17 18
22
2
1
27
26
25
Before the machine can be put into operation, the two parts of the
machine must be connected electrically and the handle must be
screwed onto the body of the machine.
To do this, follow the assembly instruction on Page 2 of these
instructions for operation.
11
10
12
14
13
15
8
6
1
2
5
3
4
9
7
Y/G
WHITE
BLACK
BLACK
BROWN
GREEN
WHITE
WHITE
WHITE
BLA
C
K
BLA
C
K
RED
BL
UE
GREEN
RED
WHITE
BLA
C
K
GREEN
RED
WHITE
Y/G
BLA
C
K
BROWN
RED
11
10
12
16
16
14
13
15
8
6
1
2
5
3
4
9
7
BLACK
BROWN
Y/G
WHITE
WHITE
Y/G
Y/G
WHITE
BLA
C
K
BLA
CK
RED
BL
UE
GREEN
BROWN
RED
Y/G
220-240VAC/50-60Hz
100VAC/50-60Hz
120VAC/60Hz
13 - Wires kit base
7
- Pressostat (for pump version)
1
- Terminal block
WHITE
WHITE
WHITE
BLACK
GREEN
1
Terminal block
9
Thermal protector pump
2
Main switch
10
Terminal block
3
Vacuum switch
11
By-pass vacuum motor
4
Pump switch
12
Microswitch
5
Wires kit electric panel
13
Wires kit base
6
Wires kit upper housing
14
Circuit boards
7
Pressostat (for pump version)
15
Brush motor
8
Pump or Electro valve
16
Wire kit vac/base