INSTALLATION AND ASSEMBLY
3.2 Field preparation
Turnstile dimensions differ according to the selected turnstile. It can be placed in the
specified area in desired way and position. Figure 3.1 shows a section of LTT 303's layout.
Figure 3.1 Turnstile layout
There are some instructions to place the turnstiles.
Instructions:
•
The floor where the turnstiles are to be mounted must be completely flat and balanced.
Installation should not be done if there is any bumps and slopes on the floor.
•
Under the floor, which the turnstile is to be mounted, must not be empty. No mounting
should be done on non-durable floors such as plasterboard, gypsum, sand etc.
•
There should be no installation or cable under the floor where the turnstile is to be mounted.
If necessary, it should be specified as a plan or project and mounted according to this
information.
•
No dust should be left in the holes while mounting of the turnstile on the floor. If possible,
please remove the dust with a pneumatic hose or similar tools.
•
Chemical mixture epoxy should be used while mounting the turnstile on ground and no
work should be done before the freezing time (30 min) is completed.
•
Mounting rods of 10 mm thickness and 150 mm length must be used to mount turnstiles on
the floor.
•
Before starting the installation of the turnstile, make sure that the conditions described in
the "installation and assembly" chapter are present.
| 13 |
Содержание LTT 303
Страница 1: ...TRIPOD TURNSTILE USER MANUAL ...
Страница 2: ... 2 ...
Страница 43: ...9 1 Management system certificate and attachment 43 QUALITY CERTIFICATES 9 ...
Страница 44: ...QUALITY CERTIFICATES 9 2 TSE Certificate and CE Certificate 44 ...