SECONDARY SPRAY APPLICATOR MAINTENANCE
www.tanningessentials.co
Secondary maintenance must be run on the applicator every 2-4 weeks or when required.
Secondary maintenance will deliver a more thorough clean to prevent or clear any blockages
and uphold the applicators performance.
O-RING SEAL
FLUID
NOZZLE
ADJUSTABLE
NOZZLE
RETAINING
RING
FLUID
NEEDLE