4
Installation:
1. Shut off water supply and drain lines.
2. Mount no.
1
assembly to wall with two no.
4
’s, no more than 8-7/8” [21 cm]
from floor to center of mounting holes. (See illustration.)
Note: It is strongly recommended that each supply line be equipped with a
hammer arrester installed per manufacturer’s instructions. A typical installa-
tion is shown:
General Instructions
floor
Note: To order replacement parts for
the bonnet assembly, order the B-50-P
parts kit. (For repair of no.17)
Note: Piping and
hammer arrestor
supplied by others.
4
wall
1-9/16”
[4 cm]
3. No.
15
and no.
16
can be raised to desired height by adjusting no.
12
with a
screwdriver.
Note: Approximate height of no.
15
and no.
16
should be 1-9/16” [4 cm]
from floor.
4. Apply Teflon Tape or pipe joint compound to threads of supply lines.
Install two (2) inlets (hot and cold sides) and one (1) outlet. Connect supply
lines with ½” NPT piping.
5. Turn on water and check for leaks.
1
11
12
15,16
Most pedal valve installations will be similar, except B-0508 Single Pedal
Valve has (1) one 1/2” NPT female inlet, and (1) one 1/2” NPT female outlet.
hammer arrester
in
out
8-7/8”
[21 cm]