
5
CONTENTS
1
DESCRIPTION OF EQUIPMENT
7
1.1
Front Panel Layout
8
1.1.1
Loading unit
9
1.1.2
Control unit
9
1.2
Electrical Specification
10
1.2.1
Supply Specifications
10
1.2.2
Output Specifications
10
1.2.3
Output Lead Set Ratings
11
1.2.4
Metering
11
1.2.5
Overload trip
12
1.2.6
Loading unit over temperature trip
13
1.2.7
Timing System
13
1.3
Construction
13
1.4
Installation
13
2
OPERATION
15
2.1
Loading Unit Configuration
15
2.2
Main Output
16
2.3
Connections
17
2.3.1
Earthing
17
2.4
Timing System
18
2.4.1
Timer Modes
18
2.4.2
General Procedure for Timing Tests
19
3
APPLICATION NOTES
– TESTING SPECIFIC DEVICES
21
3.1
Over-current Devices with Auxiliary Contacts
21
3.1.1
Timer Mode
21
3.1.2
Connections
21
3.1.3
Test Procedure
21
3.2
Timing of auto-reset/reclosing devices
22
Содержание PCU2 mk5
Страница 2: ......
Страница 8: ...8 1 1 Front Panel Layout Figure 1 1 PCU2 and loading unit front panels...
Страница 20: ......
Страница 26: ......
Страница 28: ......
Страница 30: ...30 Drawings Required A2 001660 latest issue...