background image

12 

 

The full scale range of the ammeter is dependant on the loading unit.  A switch is provided on 
the PCU2 to switch the meter between the series and parallel range. 

Loading Unit 

Output 

arrangement 

Ammeter 

range 

Meter full 

scale 

Resolution 

Accuracy 

LU5000 
LU8000 

Series 

Low 

2500A 

1A 

0.6% 6d 

High 

5.00kA 

10A 

0.6% 6d 

Parallel 

Low 

5000A 

1A 

0.6% 6d 

High 

10.00kA 

10A 

0.6% 6d 

LU6000 

Series 

Low 

3000A 

1A 

0.6% 6d 

High 

6.00kA 

10A 

0.6% 6d 

Parallel 

Low 

6000A 

1A 

0.6% 6d 

High 

12.00kA 

10A 

0.6% 6d 

 

If  the  metering  cable  is  not  connected  between  the  PCU2  MK5  control  unit  and  the  external 
loading unit, the ammeter will not function and the output will not switch on. 

1.2.5 

Overload trip 

  

The output of the unit is protected by an overload trip that operates at approximately 115% of 
full load current. 

Loading Unit 

Output 

arrangement 

Metering range 

Overload trip 

current 

LU5000 
LU8000 

Series 

Low 

2875A 

High 

5750A 

Parallel 

Low 

5750A 

High 

11500A 

LU6000 

Series 

Low 

3450A 

High 

6900A 

Parallel 

Low 

6900A 

High 

13800A 

 

The unit is also protected by a circuit breaker on the control unit output. This will trip before the 
electronic trip on high range (at approximately 10000A for an LU5000/8000 or 12000A for an 
LU6000). 

Содержание PCU2 mk5

Страница 1: ...t Injection System Type PCU2 mk5 LU5000 LU6000 LU8000 DESIGNED AND MANUFACTURED BY T R Test Equipment Limited 15 16 Woodbridge Meadows Guildford Surrey GU1 1BJ United Kingdom Telephone 01483 207428 e...

Страница 2: ......

Страница 3: ...connections to any terminal It is ESSENTIAL to consult the product manual for rating information before making any connection to a terminal or terminal group marked with a warning triangle Only use fu...

Страница 4: ...ymbols may appear in this manual CAUTION This action or procedure may be dangerous if not carried out correctly and may cause damage to the equipment or connected equipment WARNING This action or proc...

Страница 5: ...t over temperature trip 13 1 2 7 Timing System 13 1 3 Construction 13 1 4 Installation 13 2 OPERATION 15 2 1 Loading Unit Configuration 15 2 2 Main Output 16 2 3 Connections 17 2 3 1 Earthing 17 2 4 T...

Страница 6: ...e 22 3 3 Timing Devices with NO Auxiliary Contacts 23 3 3 1 Timer Mode 23 3 3 2 Connections 23 3 3 3 Test Procedure 23 4 MAINTENANCE 24 5 ACCESSORIES 25 5 1 Standard Accessories 25 5 2 Optional Access...

Страница 7: ...lities and a flexible timing system are provided WARNING The PCU2 and associated loading units are designed to be used on dead systems i e no externally supplied voltages are present on the test objec...

Страница 8: ...8 1 1 Front Panel Layout Figure 1 1 PCU2 and loading unit front panels...

Страница 9: ...ng input from loading unit H Ammeter Displays load current I Ammeter range switch Selects ammeter low high range J Ammeter series parallel switch Selects Series parallel connection for metering K Load...

Страница 10: ...ec on 1 min off 1 sec on 1 min off LU5000 Series 8V 1250A 2500A 4000A 5000A Parallel 4V 2500A 5000A 8000A 10000A LU6000 Series 6 6V 1375A 3000A 4800A 6000A Parallel 3 3V 2750A 6000A 9600A 12000A LU800...

Страница 11: ...ill become hot in use Ensure adequate cooling time is allowed before touching cables or connectors after tests Note The output leads should not be rested against any sharp edges whilst testing The ins...

Страница 12: ...cable is not connected between the PCU2 MK5 control unit and the external loading unit the ammeter will not function and the output will not switch on 1 2 5 Overload trip The output of the unit is pro...

Страница 13: ...0 01 rdg 3d NOTE In current operated mode timing results obtained with test currents below 20 of the selected ammeter range and on measured times of 19ms and below are of doubtful accuracy The PCU2 ha...

Страница 14: ...le provided The connector and supply must be rated for 100A It is also important to ensure that the unit is adequately earthed It is suggested that the earth stud on the side of the unit is connected...

Страница 15: ...er current with a lower voltage or a lower current with a higher voltage The links on the control unit must be connected to select series or parallel operation Configuration Link terminals Series 2 3...

Страница 16: ...a 0 230V supply rated at 100A for 5 minutes on 15 minutes off This output is NOT isolated from the mains and is not designed to be used without an isolating loading unit The units are designed to dri...

Страница 17: ...ure low impedance connections are made between the output of the loading unit and the object under test Ensure that the output cables are suitable rated for the test current to avoid danger of fire If...

Страница 18: ...al Contact set 2 has a volt free contact input 2 4 1 Timer Modes 2 4 1 1 Timer Mode Off In the off mode the timer has no effect on the operation of the set and the timer does not run This mode is used...

Страница 19: ...re the regulator knob is fully anti clockwise before switching on Ensure the timer mode switch is in the off position and depress the on push button Increase the current by rotating the output control...

Страница 20: ......

Страница 21: ...1 3 Test Procedure Switch on the main supply switch Set timer mode switch to the off position Ensure that the output regulator is in the zero position Set loading unit series parallel switch to appro...

Страница 22: ...ch Set timer mode switch to the off position Ensure that the output regulator is in the zero position Set loading unit series parallel switch to appropriate settings Check that connections are made as...

Страница 23: ...mer mode switch to the off position Ensure that the output regulator is in the zero position Set loading unit series parallel switch to appropriate settings Check that connections are made as above Pr...

Страница 24: ...placement brushes are available from T R Test Equipment stock number SPA 0110 The intervals between inspection and renewal of the brushes will depend upon the amount of usage However it should be reme...

Страница 25: ...ends to suit the PCU2 control unit and the external loading unit c 5 metre long metering lead terminated at both ends to suit the PCU2 control unit and the external loading unit 5 2 Optional Accessori...

Страница 26: ......

Страница 27: ...output to isolated output Applied Voltage Test Mains input to frame and all isolated outputs 2kV RMS for 1 minute All combinations of isolated output to isolated output Isolated output to frame 1 5kV...

Страница 28: ......

Страница 29: ...29 7 REVISION Product Type Primary Current Injection PCU2 MK5 Loading Units File PCU2 MK5 manual v2 doc Author I Lake Issue Date 2 24 06 2013 Modified By T Clark Checked By P Cole Date 24 06 2013...

Страница 30: ...30 Drawings Required A2 001660 latest issue...

Отзывы: