
Installing the VCS
2
Installing the VCS
General warnings
Do not place heavy objects directly on top of the VCS.
•
Do not place hot objects directly on top of, or directly beneath the VCS.
•
Preparing the installation site
Before installing the VCS:
Make sure that the VCS is accessible and that all cables can be easily connected.
•
To ensure adequate ventilation, leave a space of at least 10cm (4 inches) behind the VCS’s
•
rear panel and 10cm (4 inches) in front of the front panel.
The room in which you install the VCS should have an ambient temperature between 0ºC
•
and 35ºC (32ºF and 95ºF) and between 10% and 90% non-condensing relative humidity.
Use a grounded AC power outlet for the VCS.
•
Preparing the unit
Unpack the unit.
1.
Mount the rack ears or rubber feet.
2.
Turn the unit back on its feet or mount it in the rack.
3.
i
TANDBERG recommends that if this product is mounted in a rack you use additional
support accessories such as rack side support angles (rack angle brackets) or rack
shelves, due to the unit’s weight and depth. Contact your rack supplier to request the
accessories best suited for your rack.
Connecting the cables
Connect the power cable to the back of the VCS (see Figure 1).
1.
Connect the Ethernet LAN cable from the
2.
LAN1
port on the front of the VCS to your
network (see Figure 2).
Powering on the VCS
Turn on the power switch on the back right of the unit (adjacent to the power cable).
1.
power switch
soft power button
power cable
Figure 1: VCS back view