P
A
G
E
2
2
/2
2
TA
N
D
B
E
R
G
Telepresence T3
119076.02 TELEPRESENCE T3 ROOM REQUIREMENTS 12.08
140 5
1 2
"
4600 181
1 8
"
85 3
3 8
"
Centerline
On Floor Cable Routing - Transport cables from T3 Power / AV / Lan
Video Lan
Customers Lan
Master Panel
Fire Emergency switch
(Controls fuse groups A,B and C)
Light
Control Data Panel
On floor Cable Routing
Cables runs between LEDs and base board
Cables runs between LEDs and base board
- Transport cables from T3
Unit: mm/"
Scale:
Sheet Size:
Drw No.
:
TANDBERG
T3 Cabling
119168
04.11.08
01
www.tandberg.com
Wiring of
RS-232 cable
from Doc.Cam. to T3 cable tray above suspended ceiling
Wiring of VGA
cable
from Doc.Cam. to T3 cable tray above suspended ceiling
17.11.08
02
01.12.08
03
Hardwire outlet for light, mounted sideways on wood lattice.
LED 5
LED 4
LED 3
LED 2
LED 1
3 x junction box
Leader Cable
LED organisation Europe (Junction box and extra cables supplied by local electrician)
Leader Cable
Doc. Title:
Sign.:
Date:
Revision:
Related Tandberg Product -
TANDBERG T3
1:25
A3
LED 5
LED 4
LED 3
LED 2
LED 1
4 x jumper Cable
Leader Cable
LED organisation USA (Jumper cables and leader cable supplied by Tandberg)
5
(US 8)
4
(US 8)
Cust
omer
’s LAN
Video LAN