Talkpool OY1410 Скачать руководство пользователя страница 2

Digital activation

 

 
Standard devices are configured to use OTAA (Over The Air Activation). It is possible to 
order a batch of devices configured for ABP (Activation By Personalization). 
 
Standard devices are configured with the AppEUI (a.k.a. JoinEUI) 70-B3-D5-D7-2F-F8-14-
02. It is possible to order a batch of devices configured with a customer unique AppEUI from 
the Talkpool OUI. 
 
Upon receiving your OY1400 Industrial Control and communication unit you should first 
provision it to your network server. The product comes with the following: 

1.

!

Dev EUI (also can be found on the outside of the unit) 

2.

!

App Key 

These codes are unique for each sensor. The Dev EUI can be seen as a simple identification 
code, the App Key is a securely generated authentication code.  
 
The first step you should take is to simply provision the network server, this can be 
Talkpool’s solution called Sensepool or any other system that you would like to integrate the 
sensor with, with your App EUI. 
 
The second step is to provision the application server with your unique Dev EUI and App 
Key. 
 

Digital activation process 

 

 
 
 

 

 
 
 

 
After the digital activation the sensor has to be physically activated and installed. 
 

 

1

 

 

Provision network server with App EUI 
 

2

 

 

Provision application server with unique Dev EUI and  
App Key 

Содержание OY1410

Страница 1: ...epool visualization layer and information for advanced users The OY1400 Industrial communication and control unit is designed with focus on ease of use and reliable operation in LoRaWAN networks The p...

Страница 2: ...Dev EUI also can be found on the outside of the unit 2 App Key These codes are unique for each sensor The Dev EUI can be seen as a simple identification code the App Key is a securely generated authe...

Страница 3: ...Set depending on watermeter see table below Pulse ratio X Set to same a K index OUT3 Absolute count Pulse length 80 The K index and Pulse ratio X defines the number of liters per pulse It is important...

Страница 4: ...circuits if it is left unconnected inside the OY1410 Feed the cable though the left cable gland Connect the IWM PL3 or IWM PL4 according to the table below as illustrated by the picture to the right W...

Страница 5: ...r If you require more advanced information on the OY1410 Pulse meter please check the next sections 3 Open the unit connect the sensor and verify the jumper settings 4 Install batteries activating the...

Страница 6: ...he fraud detection indicator in the LoRa uplink message will be set in coming reports until the fraud detection indicator has been explicitly cleared using a LoRa downlink request The OY1410 also dete...

Страница 7: ...Field Bytes Value Description Note Type 1 xx 0x01 Data 0x02 Command NACK Index 1 xx Command Index Data As defined for Command Index only for Type Data Downlink command network device Field Bytes Value...

Страница 8: ...endian Minutes 1 10080 Query Set No Measurement interval in minutes Setting measurement interval resets the measurement timer 0x2B IWM data Counter Status Uint32 followed by Uint8 Big endian Count fol...

Страница 9: ...is 1234HEX 4660 Status bit 0 is set indicating a reset has been detected Setting the reporting interval to 1440 minutes 24 hours Downlink command 012605A0 Reset the Status bits Downlink command 012D0...

Отзывы: