4 - STORAGE

The Hydrants should be stored in a location that protects them 

from any pollution or contamination. Do not store the hydrants 

out of doors. During the storage period, the hydrants must be 

protected (e.g. by covering them with a tarpaulin) against outside 

influences and impurities like: 
- Humidity and rain, to avoid corrosion, 
- Wind and sand, to avoid the penetration of solid particles that 

could damage the guiding area and seat, 

- Sunshine and heat, to prevent oxidation of the elastomer and 

coating due by ultraviolet light. 

Take into account also that long storage under severe conditions 

can cause damage to the coating, elastomer and seals.
Leave the shut-off cone in the closed position in order to avoid to 

damage it. 
Take care to not damage the coating. Ensure that the hydrants 

is stored in a stable position. Store hydrants lying in a stable 

horizontal position.
If long-time storage is required, the place of storage should be 

selected in such a way that the following conditions are met: 

frost-protected - cool - dry - dust-free - dark (for elastomer 

UV-light is inadmissible). If it is impossible to comply with these 

conditions, the hydrants must be packed to meet the above 

mentioned requirements (e.g. they must be sealed inside dark 

plastic sheets). 
The protective flange covers or packing should be kept up to the 

assembly phase. 
The valves are designed for a storage temperature of – 20°C to 

+50°C. 

5 - INSTALLATION 

INTO THE PIPELINE

WARNING

Before installation, refer to 

technical leaflet W331 from DVGW 

for deployment, installation and 

implementation.

 5.1  Location of installation

Warning! After installation, it is important that all around the 

hydrant there is free access for operation and maintenance. 

 5.2  Assembly positions

Our hydrants are designed to be installed and assembled only in 

the vertical position. 

 5.3  Installation

Prior to installation: 
•  Remove all packing material from the hydrant, as well as 

the protective flange covers. 

•  Check configuration of the material in order to control the 

compatibility of the hydrant with the fluid that is going to 

flow inside and with the external environment. 

•  By turning the operating square cap anti-clockwise, and  

clockwise open and close the hydrant to check its integrity 

and ensure that it works properly. If it does not, or if any 

damage is observed, inform us immediately. 

•  Clean off any dirt which may have settled on the sealing 

surface during transport or storage. Check if there are 

foreign bodies that could prevent correct operation. 

•  Check that pipeline is free from impurities and foreign 

matter. If necessary flush and clean the pipeline in order to 

evacuate all foreign matter. Foreign matter, residue or dirt 

might damage the shut-off cone or affect the operation of 

the hydrant and even block it.

•  Check that the gaskets’ seats on the duck foot bend (N-piece) 

and that the gasket of the hydrant flange are perfectly clean 

and free from stripes, which may prevent watertight sealing. 

If necessary, clean the flange of the duck foot bend (N-piece) 

to remove any particles or dirt which may have been deposited 

there. 

•  Check that the flanges of the duck foot bend (N-piece) are 

drilled in accordance with the same standards as the hydrants. 

•  The mating flange of the duck foot bend (N-piece) must be in 

the horizontal plan position. 

When connecting the hydrant to the pipe, avoid the transmission 

of stress from the pipe to the hydrant body. Make sure that the 

distance between the top of the operating square cap and the 

Ground level is between 90 to 220 mm (as requested in technical 

leaflet W331 from DVGW / see figure 5).
As the hydrant is delivered with a built-in inlet flange gasket 

(which is reinforced by a composite insert) , do not :
•  Use an extra flange gasket to connect the hydrant to the 

network.

•  Remove the built in inlet flange gasket to replace it by a 

standard flange gasket.

It is required to install an isolation valve on the pipe, upstream of 

the inlet of the hydrant, in order to isolate it from the network for 

maintenance work.
For stability, the duck foot bend (N-piece) must be sufficiently 

anchored by means of a concrete block or by any other appropriate 

means.
For assembly, 8 bolts with size of M16 are necessary. For each 

flange’s hole, washers shall be placed on both sides of the 

flange’s assembly: 

Содержание ERHARD HALIOSTM

Страница 1: ...l description 3 Transport handling and lifting 4 Storage 5 Installation into the pipeline 6 Commissioning and Operation 7 Maintenance 8 Hydraulic characteristics 9 CE marking 10 After sales service co...

Страница 2: ...cidents applicable in the user s country and place of installation the approved technical rules for relevant worker qualifications and safety standards must also be adhered to The user s staff are res...

Страница 3: ...energy compressed air pressurized water hydraulic system must be avoided A copy of the operating and maintenance instructions must always be available on site and must be protected against oil and gre...

Страница 4: ...that are specific to the country Safety regulations for hydraulic hose pipes European Construction Products Directive 89 106 CEE DVGW worksheet W331 1 2 10 Dangers caused by electric energy A potentia...

Страница 5: ...alled component can withstand for a relatively short time not valid for non closed valves Each product is individually tested on the production line before delivery The strength and tightness of the g...

Страница 6: ...let claw and bonnet 4 A2 70 A2 70 14 Operating square cap 1 EN GJS 450 10 3 EN GJS 450 10 3 15 Bolt 1 A2 70 A2 70 16 Square cap plug 1 PE HD PE HD 17 Foreign matter deflector 1 EPDM EPDM 18 Outlet cla...

Страница 7: ...ises through the vertical tubing 7 to emerge at the outlet claw 11 During the downward movement of the shut off cone 4 its two guiding lugs close the two drainage orifices 3 The rotary motion in the c...

Страница 8: ...5 80 UHA 1 25 922 48 243 178 120 108 75 50 110 9 4 30 5 80 UHA 1 50 1172 48 243 178 120 108 75 50 110 9 4 34 5 80 UHAD 0 75 474 48 243 178 120 108 75 50 110 9 4 24 80 UHAD 1 00 672 48 243 178 120 108...

Страница 9: ...a flow restricting position can cause cavitation and major wear of the products that will lead to leakage and malfunctions This type of underground fire hydrants is suitable only for OPEN CLOSED opera...

Страница 10: ...operations Hydrants too heavy to be handled manually must be transported by means of a lifting device suitable for the weight involved e g broad belts Avoid use of chains and ropes in order to protec...

Страница 11: ...iguration of the material in order to control the compatibility of the hydrant with the fluid that is going to flow inside and with the external environment By turning the operating square cap anti cl...

Страница 12: ...stalled it must be subject to a visual check After installation the hydrant must be checked for movement of the inner valve turn the square cap over the total stroke OPEN CLOSE Each hydrant must be op...

Страница 13: ...high flow velocity An extension of the operating key by use of a lever or similar is not allowed It is not permitted to open the hydrant against a closed inspection or revision valve Do not exceed op...

Страница 14: ...mplete Bonnet The hydrant is not opening Upstream isolating valve is closed Check the opening or open the upstream isolating valve and try again to close the hydrant Defective operating nut Replace op...

Страница 15: ...er pressure it is essential to operate the hydrant very slowly when opening because some air under pressure might have become trapped 16 27 8 4 8 1 7 13 10 25 26 2 5 3 6 12 1 15 18 17 13 12 20 21 19 1...

Страница 16: ...round 30 mm Align the holes of the bonnet with the threaded holes of the body Place two special hexagonal bolts M16 of minimum 70 mm length with their washers M16 and screw them gradually in alternate...

Страница 17: ...0 SPA00071TS Operating inside trim RD1 50 EPDM cone HALIOSTM 2 3 4 5 6 10 SPA00073TS Complete flange bearing HALIOSTM HALIOSTM Premium 7 8 1 8 2 8 3 8 4 9 10 11 both colors 12 13 14 15 16 25 26 27 SPA...

Страница 18: ...he object of a CE marking and also a CE declaration of conformity 10 AFTER SALES SERVICE CONTACT For technical assistance or all questions that concerns the product or IOM manual please find the detai...

Страница 19: ...nnovative technology global expertise and individual consultation processes form the basis for developing long term solutions for the efficient treatment of the vitally important resource water ERHARD...

Отзывы: