131
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1
mm (0.02 ~ 0.04 in.) between the nut and
bucket bush, or the nut will come loose.
5. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
E4G056
4
E4G057
3
E4G055
0.5~1mm
1
(0.02~0.04 in.)
Содержание TB23R
Страница 6: ...4...
Страница 8: ...6...
Страница 35: ...33 SAFETY Safety Signs Decals...
Страница 36: ...34 SAFETY Safety Signs Decals...
Страница 150: ...148...
Страница 151: ...149 SPECIFICATIONS Main Speci cations 151 Machine Dimensions 152 Operating Range 154 Lifting Capacities 157...
Страница 152: ...150 MEMO...
Страница 154: ...152 SPECIFICATIONS Machine Dimensions...
Страница 156: ...154 SPECIFICATIONS Operating Range...
Страница 158: ...156 MEMO...
Страница 164: ...162...
Страница 175: ...173 MEMO...
Страница 182: ...180...
Страница 183: ...181 INDEX...