3
■
Front, rear, Ieft and right
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
■
Designated operations
Use this machine primarily for the following
operations:
¡
Excavating
¡
Digging ditches
¡
Digging side ditches
¡
Leveling
¡
Loading
MACHINE DESCRIPTlON
■
Features
¡
Short pitch rubber crawler
¡
Low engine noise and exhaust emissions
¡
Fast working speed and low-shock working equipment
¡
Excellent stability thanks to a low center of gravity
■
Break-in period
When is new, heed the instructions below when operating the machine for the first 100 hours
(as indicated on the hour meter).
Using a new machine roughly without breaking it in will lead to quicker deterioration of machine
performance and may shorten the machine’s service life.
¡
Warm up the engine and hydraulic oil sufficiently.
¡
Avoid heavy loads and rapid operations. Operate with a load of about 80% the maximum
load.
¡
Do not start up, accelerate, change directions, or stop abruptly unless necessary.
Содержание TB108
Страница 6: ...4...
Страница 8: ...6...
Страница 52: ...50...
Страница 82: ...80...
Страница 83: ...81 TRANSPORT Loading and Unloading 82 Securing the Machine 83 Cautions on Transporting 84...
Страница 137: ...135 SPECIFICATIONS Main Specifications 137 Machine Dimensions 138 Operating Range 140 Lifting Capacities 143...
Страница 138: ...136 MEMO...
Страница 140: ...138 SPECIFICATIONS Machine Dimensions P X D Y Z T L U B X N M B5K001 F S E V C G Q J W H K R A...
Страница 142: ...140 SPECIFICATIONS Operating Range B5K002 E F G D C H B J K A...
Страница 144: ...142 MEMO...
Страница 150: ...148...
Страница 163: ...161 INDEX...