background image

2

■Floor surface

 

○Ensure that the material or finishing of the floor surface is waterproof or has a waterproof coating applied.

○This product weighs There are maximum 55

. Please refer to the sufficient reinforcement work on the installation floor portion.

○Always ensure that the floor surface is horizontally level.

○Ensure that the floor surface is smooth and free from bumps around the attachment areas.

○Pipe risers

○If the floor surface is tiled, cracks may occur when fastening the bolts during installation of the RS SWING main body.

If this looks likely to happen, use the main body attachment diagram and template as a reference and change the material 

of the attachment area that is in contact with the floor to another such as plywood or mortar.

○The following levels of strength are required for the floor surface.

○Be sure to take the necessary precautions to prepare for and prevent possible water leakage.
○Use waterproof flooring materials.
○When installing the product on the 2nd floor or higher, be sure to observe waterproofing (waterproofing works,

installing a pan made of stainless panel, etc. or installing water leakage sensor.).

○Be sure to cover an opening of raised plumbing and a connection of pipes by caulking material, etc.

■Request measures to prevent water leakage under the floor and downstairs

Hot water / water supply
Drainage

 

Rc 1/2"; pipe risers from floor; rise dimensions: hot water 50 mm; water 50 mm
VU40/VP40; pipe risers from floor; rise dimensions: 60 mm

Wooden floor
Mortar floor

Mortar thickness of 50 mm or more

Special floor (stone finish)

A foundation with levels of strength listed above around the installation areas is required.

Plywood thickness of 30 mm or more (two 15 mm sheets joined together)

■Installation of pipes

The following are important points to adhere during the installation of pipes. Read through

the details carefully and ensure that the pipes are installed correctly.

○This product is designed for indoor installation. Always install this product indoors.

■”Precautions during installation of pipes”

○Do not use pipes made of materials that may introduce rust for the water supply pipe. In general, VP pipes or other materials 

specified by regulations in that particular region, are recommended for installation.

○In general, Type L deoxidized copper pipes are recommended for hot water pipes.
○In general, the same diameter and same pressure is recommended for hot water pipes and water supply pipes.
○Always use a reamer to deburr the ends of cut pipes.
○Avoid using inverted U-shaped pipes (siphon) as these can cause air to become trapped.
○Always connect hot water and water supply pipes after removing all contaminants such as dirt, sand and oil. 

Failure to follow this instruction may cause problem.

○Ensure that the drain pipe is installed at a gradient of 1/50 for a diameter of φ75 or less, or 1/100 for a diameter of φ75 

or more.

○Do not connect the hot water and water supply pipes in reverse.

Connecting pipes in reverse will mean the temperature of water cannot be controlled properly by the water faucet,

which can cause problems including burns.

○Ensure that the hot water pipe from boiler is only run over a short distance so as to minimize resistance.

Longer pipe can cause fluctuations in temperature and poor hot water delivery.

○Boiler pipes

 In general, the same diameter and same pressure is recommended for main hot water pipe and main water supply pipe.

 Ask professional to install boiler.

○Product comes with hair catchers installed. Handle it with care.
○Always wrap pipes with lagging material after installation is complete.
○After connecting the pipes and executing water flow test, clean the filters and showerhead.

Before installation

Содержание RS

Страница 1: ...install RS SWING Customers must not install RS SWING by themselves Customers must store these instructions in a safe place so as not to lose them To the installer The instructions should be thoroughly...

Страница 2: ...pipes The following are important points to adhere during the installation of pipes Read through the details carefully and ensure that the pipes are installed correctly This product is designed for i...

Страница 3: ...he hot water temperature to 80 or less Set the temperature 10 or highter than the shower temperature used Water used Hot water supply water supply pressure Hot water temperature into the product Water...

Страница 4: ...e Base cover Plug Drain cap Hair catcher Basin Main unit Stainless flexible pipe Stop valve Stop valve knob Rear cover Neck cushion Front cover Level adjustment plate Screw Set Operationg manual Insta...

Страница 5: ...es of water hot water and drain and prepare for the installation 1 Set the paper template on the floor aligning it with the floor fixing position of the fixing base The floor fixing point of the fixin...

Страница 6: ...five fixing screws spring washers and flat washers Bolt to be used M8 hexagonal head bolt with washer 5pcs 6 Caution Always have at least two peole to do this process it may cause breakage of the prod...

Страница 7: ...Fixing Screws Adjuster Screw Adjuster Screw 4 locations Fixing Screw 5 locations 2 Fasten the Fixing Screw Height and horizontal adjustment 1 Using the level vial adjust the level with four adjuster s...

Страница 8: ...embling 8 Base Cover Truss Head Screw Plug Set of base cover Attach the base cover on the base Set of shampoo basin Attach the shampoo basin to the top of the arm and fix it with a truss screw and a p...

Страница 9: ...Drain Hose Bearing Sleeve VU50 Drain pipe Water Supply Hose Drain Hose Connection of the Water supply hose Connect the water supply hose and drain hose Connection of the Drain hose Insert the drain ho...

Страница 10: ...1 Fix the front cover to the shampoo unit body with six tapping screws 2 Attach the stop valve knob Before connecting the pipes remove any waste from pipes such as dust dirt sand or oil 1 Bend each st...

Страница 11: ...filtered check valve then adjust the pressure It is recommended that water supply pressure and hot water supply pressure become the same pressure Caution Always test the water flow to prevent accident...

Страница 12: ...hampoo basin mounting surface height 977 497 428 650 90 887 162 60 50 52 470 325 187 241 90 80 84 205 522 Water supply Hot water supply Drainage Drainage Water supply Hot water supply Chair side Rotat...

Страница 13: ...o prevent accidents during operation Be careful about the installation direction If the cushion is installed in the wrong direction it may contact the backseat Caution Execute the installation using t...

Страница 14: ...90 185 Raising pipe area 55 80 Water Supply 1 2 13m m Rise 60mm Hot Water Supply 1 2 15m m Rise 60mm Drainage VU40 Rise 50mm Chair Side Distance to the wall or the furniture Min 1350mm Including work...

Страница 15: ...obvious 2 Place composite panels in the peeled off area The panel surface should be higher than the surrounding tile or glass surface within 2 or 3 mm 3 Caulk gaps between the composite panels and the...

Страница 16: ...16 1E0512A0 1 1 2 Chome Higashi shinsaibashi Chuo ku Osaka Japan Printed in Japan TAKARA BELMONT CORPORATION TEL 06 6213 5945 FAX 06 6212 3680 NOTE...

Отзывы: