Installation of Main unit
5
●Opening of the packing
(1) Takes out the base.
●Secure the fixing base on the floor using the screws or the anchor bolts.
Fix the base to the floor with four screws and washers.
a) Plywood floor
b) Concrete floor
c) Tile floor
; Hex head tapping screw M8-60
; Anchor bolt M8-70
; Remove the tile with template paper.
Put the plywood and fix the shampoo unit to the floor.
●Marking the bolt anchor points
○Refer to the floor template (pages 14 to 15) and overall layout diagram, check the dimension of the
raised pipes of water, hot water and drain, and prepare for the installation.
(1) Set the paper template on the floor aligning it with the floor fixing position of the fixing base.
*The floor fixing point of the fixing base differs depending on the chair used with Yume Swing.
(2) Mark the screw or bolt anchor position of the fixing base (four locations).
15mm within
Caution
・
To use a fixed position adjacent if you can not use the standard fixed position.
・
To increase the fixed position when the strength of the floor can not be taken well.
・
Since the cover and base of the interval is narrow, the floor finish up when the base.
・
The depth of the pilot hole of the anchor bolt, the bolt head is set to be from the floor
within 15mm.
Screw
Washer
Base