![Tailift TPR720A Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/tailift/tpr720a/tpr720a_operation-manual_3265689026.webp)
4-6
4.4 The test after installation.
a. Have the main power on.
b. Press the emergent stop button to see whether it stops immediately.
c. Power on again.
d. Please check whether the motor is running smoothly. If there is any errors, Please
select two of the wires L1, L2 and L3 and change its position.
e.
Check every mechanism to see whether it works normally.
4.5 The procedure for dismantling the machine.
The dismantling procedure is the reverse of the installation one.
Содержание TPR720A
Страница 1: ...D E C 0 0 2 0 4 TAILIFT LTD 2006 RADIAL DRILLS TPR720A TPR820A TPR920A TPR1100 Operation Manual...
Страница 6: ...1 5 b 2 The rear view only for TPR 1100 C Oil filler position and Oil Drain outlet position Gearbox...
Страница 7: ...1 6 Arm elevating motor For TPR 720A TPR 820A TPR 920A Arm elevating motor For TPR 1100...
Страница 30: ...5 4 5 1 2 For TPR 1100 The front view of TPR 1100...
Страница 40: ...5 14 Examples of clamping using the universal clamp...
Страница 81: ...9 6 9 6 Electrical Circuit Diagram For TPR720A TPR820A TPR920A Standard...
Страница 84: ...9 9 9 8 Electrical Circuit Diagram For TPR1100 Standard...