![Tailift TPR720A Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/tailift/tpr720a/tpr720a_operation-manual_3265689024.webp)
4-4
4.3 Installation of the machine.
4.3.1 Have the machine set onto the fastening bolts of the crate base.
(1) Tools
Sling, lifting equipment, spanner, movement plate, insertion blocks and level
adjusting blocks.
(2) Procedure
a. After dismantling the wooden crate, get the manuals and tool box out.
b. Remove the fastening bolts.
c. Hook it using sling, lift it up and move to site for installation.
d. Align the ground bolts and the base bores and set the later onto them.
Meanwhile, have the level adjusting blocks inserted to the underneath of the level
adjusting bolts.
e. Remove the lifting equipment and slings.
f. Have nuts for the ground bolts mounted.
Содержание TPR720A
Страница 1: ...D E C 0 0 2 0 4 TAILIFT LTD 2006 RADIAL DRILLS TPR720A TPR820A TPR920A TPR1100 Operation Manual...
Страница 6: ...1 5 b 2 The rear view only for TPR 1100 C Oil filler position and Oil Drain outlet position Gearbox...
Страница 7: ...1 6 Arm elevating motor For TPR 720A TPR 820A TPR 920A Arm elevating motor For TPR 1100...
Страница 30: ...5 4 5 1 2 For TPR 1100 The front view of TPR 1100...
Страница 40: ...5 14 Examples of clamping using the universal clamp...
Страница 81: ...9 6 9 6 Electrical Circuit Diagram For TPR720A TPR820A TPR920A Standard...
Страница 84: ...9 9 9 8 Electrical Circuit Diagram For TPR1100 Standard...