![Tailift TPR720A Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/tailift/tpr720a/tpr720a_operation-manual_3265689016.webp)
3-1
CHAPTER 3
Preparation to Install
3.1 Space and room requirement
3.1.1 Floor requirement
Using this machine requires solid and well-structured floor and its good level.
Note:
1.
For adjusting level, please refer to the chapter 6.
2.
Adjusting level is needed before using this machine. The level adjusting tolerance
must be within 1 mm/m.
a. For TPR-720A ,TPR-820A ,TPR-920A floor diagrams. (Unit : mm)
The above diagrams are for the bases and ground bolts, as well as its relative positions of
TPR-720A, TPR-820A and TPR-920A.
b. For TPR-1100 floor diagrams (Unit : mm)
The above diagrams are for the bases and ground bolts, as well as its relative positions of
TPR-1100
Содержание TPR720A
Страница 1: ...D E C 0 0 2 0 4 TAILIFT LTD 2006 RADIAL DRILLS TPR720A TPR820A TPR920A TPR1100 Operation Manual...
Страница 6: ...1 5 b 2 The rear view only for TPR 1100 C Oil filler position and Oil Drain outlet position Gearbox...
Страница 7: ...1 6 Arm elevating motor For TPR 720A TPR 820A TPR 920A Arm elevating motor For TPR 1100...
Страница 30: ...5 4 5 1 2 For TPR 1100 The front view of TPR 1100...
Страница 40: ...5 14 Examples of clamping using the universal clamp...
Страница 81: ...9 6 9 6 Electrical Circuit Diagram For TPR720A TPR820A TPR920A Standard...
Страница 84: ...9 9 9 8 Electrical Circuit Diagram For TPR1100 Standard...