![Tailift TPR1100 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/tailift/tpr1100/tpr1100_operation-manual_813882023.webp)
4-3
4.2.3 The order to pack
Please pack according the following procedure:
1. Place the base plate 1 under the machine and have both the plate and the machine
fastened with bolts.
2. Install the side plate 2.
3. Install the side plate 3.
4. Install the side plate 4.
5. Install the side plate 5.
6. Install the top plate 6 and pack it.
Содержание TPR1100
Страница 1: ...D E C 0 0 2 0 4 TAILIFT LTD 2006 RADIAL DRILLS TPR720A TPR820A TPR920A TPR1100 Operation Manual...
Страница 6: ...1 5 b 2 The rear view only for TPR 1100 C Oil filler position and Oil Drain outlet position Gearbox...
Страница 7: ...1 6 Arm elevating motor For TPR 720A TPR 820A TPR 920A Arm elevating motor For TPR 1100...
Страница 30: ...5 4 5 1 2 For TPR 1100 The front view of TPR 1100...
Страница 40: ...5 14 Examples of clamping using the universal clamp...
Страница 81: ...9 6 9 6 Electrical Circuit Diagram For TPR720A TPR820A TPR920A Standard...
Страница 84: ...9 9 9 8 Electrical Circuit Diagram For TPR1100 Standard...