Operations Manual
SV-2000-IX
Document Number: 275-MNL-002
Page 76 of 84
Version 1.0. 08/25/2010
Avoid static-causing surfaces such as carpeted
floors, plastic, and packing foam.
Remove components from their antistatic bags
only when you are ready to use them. Do not
lay components on the outside of antistatic
bags because only the inside of the bags
provide electrostatic protection. Always hold
memory modules and components by their
edges or their metal mounting brackets.
Avoid touching the edge connectors and
components on the cards. Never slide memory
modules or components over any surface.
6.9 Power Supply Cable Retention Bracket Installation
____1.0
:
Initial Check Points
____1.1
VERIFY
the Work Permit instructions
have been completed.
____1.2
VERIFY
locks and tags are properly
attached to equipment.
____1.3
VERIFY
all power is removed from
the Server.
____2.0
Install AC Retainer
Bracket
:
____2.1
SV-2001-THS-Server. (Figure 6-72).
____2.4
Secure Power Supply Cable
Retention Bracket by the
THREE
supplied screws. (Figure 6-74).