background image

KEY:

VI, V2, V3 = SHUT-OFF ISOLATION VALVE
P = TACO IFC CIRCULATOR
FF = FAST FILL BOILER FEED VALVE
PV4 = PURGE VALVE

RECOMMENDED PURGING STEPS:

1.   CLOSE V1, PV4, V2
2.   OPEN V3
3.   OPEN FF VALVE
4.   OPEN V2, PV4, TO PURGE LAST ZONE

     FIRST (ZONE 3)

5.   CLOSE FF VALVE
6.   CLOSE V2, PV4
7.   REPEAT STEPS 1 TO 6 FOR EACH 

     ADDITIONAL ZONE, PURGE ZONE 1 LAST

8.   OPEN V1 WHEN ALL ZONES ARE PURGED
9.   ADJUST SYSTEM TO DESIRED OPERATING FILL 

     PRESSURE IF REQUIRED

5.  Fill system with tap water or maximum 50% glycol/water mix – The system must be filled before operating the circulator. The

bearings are water lubricated and should not be allowed to operate dry. Filling the system will result in immediate lubrication

of the bearings. It is always good practice to flush a new system of foreign matter before starting the circulator.

6.  Circulator operation – Operate the circulator for 5 minutes at full speed immediately after flushing the system to purge

remaining air from the bearing chamber. This is especially important when installing the circulator during the off-season.

7.  Turn speed dial on circulator to the desired speed and performance range. See Figure 3.

CAUTION:  Never run circulator dry or permanent damage may result.

Содержание 0015-MSF-IFC

Страница 1: ...ashing Premature failure may result Adjust expansion tank pressure to equal fill pressure A larger size expansion tank may be required INSTALLATION 1 Location Install the OO circulator on the supply side of the boiler pumping away from the expansion tank as shown in Figure 1 This is the best pump location for optimum system performance and maintaining positive system pressure An alter nate locatio...

Страница 2: ...em must be filled before operating the circulator The bearings are water lubricated and should not be allowed to operate dry Filling the system will result in immediate lubrication of the bearings It is always good practice to flush a new system of foreign matter before starting the circulator 6 Circulator operation Operate the circulator for 5 minutes at full speed immediately after flushing the ...

Страница 3: ... nose pliers carefully grip the IFC body and remove slowly PROPER REMOVAL REPLACEMENT OF THE INTEGRAL FLOW CHECK IFC Figure 4 View of IFC in discharge flange of 00 pump casing 0015 MSF3 IFC TOTAL FLOW gpm 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TOTAL HEAD ft 0 2 4 6 8 10 12 14 16 18 Flow m3 h 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 Head m 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 ...

Страница 4: ...purchaser to promptly notify the local Taco stocking distributor or Taco in writing and promptly deliver the subject product or part delivery prepaid to the stocking distribu tor For assistance on warranty returns the pur chaser may either contact the local Taco stocking distributor or Taco If the subject product or part contains no defect as covered in this warranty the purchaser will be billed f...

Отзывы: