Tab R4824 Скачать руководство пользователя страница 29

3. 

Unable to charge and discharge with red LED on. The temperature is 0~50 degree. 

Use charger to charge, not possible. Use load to discharge, not possible. 

g)  Under permanent protection. The single cell voltage has been higher than 4.2 

or lower than 1.5 or temperature higher than 80 degree. 

Solution:

 Switch off the module and contact your local distributor for repair.

4. 

Unable to charge and discharge without red LED on. The temperature is 0~50 de

-

gree. Use charger to charge, not possible. Use load to discharge, not possible. 

h) Fuse broken. 

Solution:

 Switch off the module and contact your local distributor for repair.

5. 

Buzzer rings and all LED flash

i) High voltage protection.

Cell voltage higher than 4V or module voltage higher than 55.5V.

Solution:

 

Battery system requires properly established communication with 

inverter and correctly settings on inverter to run safely. 

Check the setting of the 

inverter or charger, the charge voltage shall be 53.2~52.5Vdc; Check the commu

-

nication between battery system and inverter whether established or not; Check 
the ADD switch on battery module whether is set correctly or not; 

Under this condition, the BMS remains functional without damage. Just leave the 

module switched OFF and wait for the battery voltage drop down naturally 
(15mins) then restart. If then no alarm comes out, this means the module is ready 
for work

6. 

Buzzer rings and 

ALM solid red

j) Reverse connection of cables. 

Solution: 

Power off all battery and inverters. Disconnect breaker. Check the cable 

connection and disconnect all power cables. Check the power port damaged or 
not. Then try turn on the single module, without any cable connected. If no alarm, 
then it is reverse connection of cables. Switch off the module and contact your 
local distributor.

k) MOSFAIL.

Solution:

 Power off all battery and inverters. Disconnect breaker. Check the cable 

connection and disconnect all power cables. Check the power port damaged or 
not. Check the setting of inverter or charger, check the communication between

29

R4824_Operating_Manual_17.05.2021.indd   29

R4824_Operating_Manual_17.05.2021.indd   29

17.5.2021   14:16:02

17.5.2021   14:16:02

Содержание R4824

Страница 1: ...www tab si Lithium Ion Phosphate Energy Storage System R4824 Operation Manual R4824_Operating_Manual_17 05 2021 indd 1 R4824_Operating_Manual_17 05 2021 indd 1 17 5 2021 14 15 51 17 5 2021 14 15 51...

Страница 2: ...R4824_Operating_Manual_17 05 2021 indd 2 R4824_Operating_Manual_17 05 2021 indd 2 17 5 2021 14 15 51 17 5 2021 14 15 51...

Страница 3: ...ion 15 4 2 Danger label 15 4 3 Tools 15 4 4 Safety Gear 16 5 Installation and operation 16 5 1 Package items 16 5 2 Installation location 18 5 3 Grounding 18 5 4 Put into cabinet or racks 19 5 5 Put i...

Страница 4: ...R4824_Operating_Manual_17 05 2021 indd 4 R4824_Operating_Manual_17 05 2021 indd 4 17 5 2021 14 15 52 17 5 2021 14 15 52...

Страница 5: ...uchable area Warning electric shock Warning Fire Do not place near flammable material Read the product and operation manual before operating the battery system Grounding Recycle label The certificate...

Страница 6: ...l 9 Do not use cleaning solvents to clean battery 10 Do not expose battery to flammable or harsh chemicals or vapors 11 Do not paint any part of battery include any internal or external components 12...

Страница 7: ...nsequences or related responsibility which because of violation of safety operation or violating of design production and equipment safety standards 3 Introduction R4824 lithium iron phosphate battery...

Страница 8: ...l for expanding capacity and power 12 Adopted self cooling mode rapidly reduced system entire noise 13 The module has less self discharge up to 6 months without charging it on shelf no memory effect e...

Страница 9: ...3 2 Specification 9 R4824_Operating_Manual_17 05 2021 indd 9 R4824_Operating_Manual_17 05 2021 indd 9 17 5 2021 14 15 54 17 5 2021 14 15 54...

Страница 10: ...arge 95 Configuration max in 1 battery group 16pcs Working Temperature 0 C 50 C Charge 10 C 50 C Discharge Shelf Temperature 20 C 60 C Short current duration time 4000A 2ms Protective class I IP ratin...

Страница 11: ...battery has alarm lighting to show the battery is under pro tection SOC 6 green LEDs to show the battery s current capacity ADD Switch Dip1 RS485 baud rate 1 9600 0 115200 After change please restart...

Страница 12: ...to debug or service Pin3 232 TX Pin4 5 12V for wake up Pin5 GND for wake up Pin6 232 RX Pin8 232 GND Wake up signal shall 0 5Sec current between 5 15mA After send wake up signal the voltage shall disa...

Страница 13: ...in4 CAN H CAN H single group Pin5 CAH L CAN L single group Pin6 CAN GND CAN GND single group Pin7 485A 485A Pin8 485B 485B Power Terminals Power cable terminals there are two pair of terminals with sa...

Страница 14: ...ection and alarm Management and monitor Charge Discharge End Cells Balance Charge Over Voltage Intelligent Charge Model Discharge Under Voltage Charge Discharge Current Limit Charge Discharge Over Cur...

Страница 15: ...olution 4 2 Danger label 4 3 Tools The following tools are required to install the battery pack Wire cutter Crimping Modular Plier Screw Driver 15 R4824_Operating_Manual_17 05 2021 indd 15 R4824_Opera...

Страница 16: ...r It is recommended to wear the following safety gear when dealing with the battery pack Insulated gloves Safety goggles Safety shoes 5 Installation and operation 5 1 Package items Unpacking and check...

Страница 17: ...ll cable box If there is anything missed please contact dealer Two 4AWG power cables peak current capacity 120A constant 100A and RJ45 commu nication cable for each energy storage system For the exter...

Страница 18: ...of direct sunlight 10 There is no mandatory ventilation requirements for battery module but please avoid of installation in confined area The aeration shall avoid of high salinity hu midity or temper...

Страница 19: ...modules into cabinet and connect the cables 1 Put the battery into the cabinet 2 Drive the 4 pcs screws 3 Connect the cables between battery modules 4 Connect the cables to inverter 19 R4824_Operatin...

Страница 20: ...20 R4824_Operating_Manual_17 05 2021 indd 20 R4824_Operating_Manual_17 05 2021 indd 20 17 5 2021 14 15 58 17 5 2021 14 15 58...

Страница 21: ...o bracket 1 Dismantle the 2 holders of battery 2 Put the battery into 2 pcs of bracket 21 R4824_Operating_Manual_17 05 2021 indd 21 R4824_Operating_Manual_17 05 2021 indd 21 17 5 2021 14 15 59 17 5 20...

Страница 22: ...holes stack the batteries together And connect the 4 locker togeth er 4 Maximum 4 in stack 22 R4824_Operating_Manual_17 05 2021 indd 22 R4824_Operating_Manual_17 05 2021 indd 22 17 5 2021 14 15 59 17...

Страница 23: ...e of breaker shall be type C recommended or type D 3 The rated current shall match with system design shall consider the DC current on inverter side the number of power cable for instance if only one...

Страница 24: ...h empty Link Port 0 is the Master Battery Module others are slaves 1 master battery configure with maximum 15 slave batteries 3 Press the red SW button of master battery to power on all the battery LE...

Страница 25: ...operation 5 8 Power off 1 Turn external power source off 2 Press red SW switch of master battery Then all batteries will off 3 Switch Power switch OFF 5 9 Multi group mode By RS485 DO NOT need LV HUB...

Страница 26: ...e online The interruption of each RS485 command shall at least 1s By CAN Connect power cable first 1 Each pair of cable hold max 100A constant current Connect enough pairs of cable based on calculatio...

Страница 27: ...nable to communicate with inverter on compatible list Possible conditions 1 RS485 baud rate Check the dip switch1 set to correct one and restart All master battery shall be the same 2 CAN terminal res...

Страница 28: ...t work Solution to move battery to the normal operating temperature range between 0 C and 50 C c Current If current exceeds 90A battery protection will turn on Solution Check whether current is too la...

Страница 29: ...he commu nication between battery system and inverter whether established or not Check the ADD switch on battery module whether is set correctly or not Under this condition the BMS remains functional...

Страница 30: ...5 minutes and seek med ical attention c Contact with skin Wash the affected area thoroughly with soap and water and seek medical attention Ingestion Induce vomiting and seek medical attention 2 Fire N...

Страница 31: ...of power connector grounding point power cable and screw are suggested to be checked Make sure there is no loose no broken no corrosion at connection point Check the installation environment such as...

Страница 32: ...R4824_Operating_Manual_17 05 2021 indd 32 R4824_Operating_Manual_17 05 2021 indd 32 17 5 2021 14 16 03 17 5 2021 14 16 03...

Страница 33: ...R4824_Operating_Manual_17 05 2021 indd 33 R4824_Operating_Manual_17 05 2021 indd 33 17 5 2021 14 16 03 17 5 2021 14 16 03...

Страница 34: ...a Slovenia Tel 386 2 87 02 300 Web www tab si E mail info tab si P U R E E N E R G Y M A X I M U M P O W E R R4824_Operating_Manual_17 05 2021 indd 34 R4824_Operating_Manual_17 05 2021 indd 34 17 5 20...

Отзывы: