TAC AB, Feb 2000
1
Commissioning protocol
TAC 200 User’s Manual
Date
Commissioned by
Designation
Order no.
Drawing no.
Situated at
Remarks
P.T.O
TAC 200 Commissioning protocol
Enter the new values here!
Configuration
Switch
Function pos off
Function pos on
1
on/off control
shunt valve
2
on/off: 2 steps
on/off: 3 steps
3
radiator heating
floor heating
4
no sensor/thermostat
room sensor or thermostat
5
room sensor EGRL
room thermostat EGF1
Setpoints
Default value
New value
Remarks
P:05
SP room, day
21
(if room sensor)
P:06
SP room, night
18
(if room sensor)
P:07
Night setback SP (°C)
–10 / –2
Without/with room thermostat EGF1
P:08
Curve parallel adjustment
0
1
2
3
4
5
6
7
8
on
off
Time program 1
P:09, P10
MO
TU
WE
TH
FR
SA
SU
Day operation
from
to
from
to
Time program 2
P:11, P12
MO
TU
WE
TH
FR
SA
SU
Day operation
from
to
from
to
Control curve
Default value
New value
Remarks
P:16
Max supply temperature
80 / 55
radiator / floor heating
P:17
Min supply temperature
10/10
P:18
Curve point x 1
5 / 10
radiator / floor heating; –9 - +19
P:19
Curve point y 0
18
P:20
Curve point y 1
45 / 35
radiator / floor heating
P:21
Curve point y 2
60 / 45
radiator / floor heating
Содержание TAC 200
Страница 1: ...TAC 200 User s Manual 0 004 6921 0 GB 2000 02 09...
Страница 38: ......
Страница 39: ......
Страница 40: ...TAC AB J gershillgatan 18 SE 213 75 MALM SWEDEN 46 40 38 68 50 vx...