57
57
10
Final checks
Test run operation (manually)
10.1
10.2
02
CONTENTS
08
1
3
2
17
15
7
21
21
8
25
25
29
23
42
9
10
10
11
12
DIP switch settings overview
9.1
Application 1
Application 2
7.1
7.2
Disassembling the unit
Main components
Electronic control box
Refrigerant pipework
Water piping
Filling water
Water piping insulation
Field wiring
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Dimensions
Installation requirements
Servicing space requirements
Mounting the indoor unit
Refrigerant pipe connection
4.1
4.2
4.3
4.4
4.5
4
SAFETY PRECAUTIONS
INSTALLATION SITE
BEFORE INSTALLATION
INSTALLATION PRECAUTIONS
TYPICAL APPLICATIONS
OVERVIEW OF THE UNIT
START-UP AND CONFIGURATION
TEST RUN AND FINAL CHECKS
30
30
08
12
13
5 GENERAL INTRODUCTION
14
6 ACCESSORIES
43
43
44
46
Initial start-up at low outdoor ambient temperature
Pre-operation checks
Setting the pump
Field settings
9.2
9.3
9.4
9.5
10
15
21
42
57
Содержание SYSHP MINI SPLIT
Страница 74: ...71 NOTE ...