135
-
the CHECK button on the outdoor unit s main PCB and complete the cooling mode columns of one Sheet D and
one Sheet E of the system commissioning report for the outdoor unit.
c)
Run the system in heating mode with the following settings: temperature 30°C; fan speed high.
d) After one hour, complete Sheet B of the system commissioning report then check the system parameters using
the CHECK button on the outdoor unit s main PCB and complete the heating mode columns of one Sheet D and
one Sheet E of the system commissioning report for the outdoor unit.
6. Finally, complete Sheet C of the system commissioning report.
10.3.2
Once the commissioning test run of each refrigerant system has been satisfactorily completed as per Part 3, 10.3.1
, run the multiple systems that make up a project simultaneously and
check for any abnormalities.
Содержание Mini C Series
Страница 1: ......
Страница 2: ...1 ...
Страница 3: ...2 ...
Страница 4: ...3 1 1 1 1 2 Capacity kW Model Name 8 12 1 ...
Страница 5: ...4 2 2 1 2 2 ...
Страница 6: ...5 3 3 1 ...
Страница 7: ...6 3 2 ...
Страница 9: ...8 5 5 1 1 ...
Страница 10: ...9 5 2 Indoor ...
Страница 14: ......
Страница 16: ...15 wire x 0 75 wire x 0 75 Ambient temp Cooling 5 55 Heating 15 27 1 2 3 4 ...
Страница 17: ...16 2 ...
Страница 18: ...17 3 ...
Страница 19: ...18 4 ...
Страница 20: ...19 1 2 3 4 5 ...
Страница 56: ...98 ...
Страница 64: ...106 3 4 Figure 3 3 3 Selecting piping diameters 1 1 2 3 4 ...
Страница 67: ...109 ...
Страница 76: ...118 4 8 4 8 1 faults 4 8 2 ...
Страница 77: ...119 4 8 3 4 9 4 9 1 1 2 3 4 a b c d ...
Страница 86: ...128 box continued from previous page Pressure gauge ...
Страница 90: ...132 8 4 ...
Страница 94: ...136 11 ...
Страница 98: ...140 Project name and location System name ...
Страница 99: ......