124
5.6
Once installation of a drainage piping system is compete, water tightness and water flow tests should be performed.
Water tightness test
Fill the piping with water and test for leakages over a 24-hour period.
Water flow test (natural drainage test)
Slowly fill the drainage pan of each indoor unit with at least 600ml of water through the inspection port and
check that the water is discharged through the outlet of the drain piping.
Caution
The drain plug in the drainage pan is for removing accumulated water prior to performing indoor unit
maintenance. During normal operation, the drain should be plugged to prevent leakage.
Содержание Mini C Series
Страница 1: ......
Страница 2: ...1 ...
Страница 3: ...2 ...
Страница 4: ...3 1 1 1 1 2 Capacity kW Model Name 8 12 1 ...
Страница 5: ...4 2 2 1 2 2 ...
Страница 6: ...5 3 3 1 ...
Страница 7: ...6 3 2 ...
Страница 9: ...8 5 5 1 1 ...
Страница 10: ...9 5 2 Indoor ...
Страница 14: ......
Страница 16: ...15 wire x 0 75 wire x 0 75 Ambient temp Cooling 5 55 Heating 15 27 1 2 3 4 ...
Страница 17: ...16 2 ...
Страница 18: ...17 3 ...
Страница 19: ...18 4 ...
Страница 20: ...19 1 2 3 4 5 ...
Страница 56: ...98 ...
Страница 64: ...106 3 4 Figure 3 3 3 Selecting piping diameters 1 1 2 3 4 ...
Страница 67: ...109 ...
Страница 76: ...118 4 8 4 8 1 faults 4 8 2 ...
Страница 77: ...119 4 8 3 4 9 4 9 1 1 2 3 4 a b c d ...
Страница 86: ...128 box continued from previous page Pressure gauge ...
Страница 90: ...132 8 4 ...
Страница 94: ...136 11 ...
Страница 98: ...140 Project name and location System name ...
Страница 99: ......