110
4
4.1
4.1.1
4.1.2
1.
2.
3.
4.
5.
6.
Pipe flushing should be performed once the brazed connections have been completed with the exception of
the final connections to the indoor units. That is, flushing should be performed once the outdoor unit have been
connected but before the indoor units are connected.
Vacuum drying
4
Pipe manipulation
5
razing
2
techniques
Gas tightness test
6
Содержание Mini C Series
Страница 1: ......
Страница 2: ...1 ...
Страница 3: ...2 ...
Страница 4: ...3 1 1 1 1 2 Capacity kW Model Name 8 12 1 ...
Страница 5: ...4 2 2 1 2 2 ...
Страница 6: ...5 3 3 1 ...
Страница 7: ...6 3 2 ...
Страница 9: ...8 5 5 1 1 ...
Страница 10: ...9 5 2 Indoor ...
Страница 14: ......
Страница 16: ...15 wire x 0 75 wire x 0 75 Ambient temp Cooling 5 55 Heating 15 27 1 2 3 4 ...
Страница 17: ...16 2 ...
Страница 18: ...17 3 ...
Страница 19: ...18 4 ...
Страница 20: ...19 1 2 3 4 5 ...
Страница 56: ...98 ...
Страница 64: ...106 3 4 Figure 3 3 3 Selecting piping diameters 1 1 2 3 4 ...
Страница 67: ...109 ...
Страница 76: ...118 4 8 4 8 1 faults 4 8 2 ...
Страница 77: ...119 4 8 3 4 9 4 9 1 1 2 3 4 a b c d ...
Страница 86: ...128 box continued from previous page Pressure gauge ...
Страница 90: ...132 8 4 ...
Страница 94: ...136 11 ...
Страница 98: ...140 Project name and location System name ...
Страница 99: ......