2-1-1
U25MEN
STANDARD MAINTENANCE
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
H: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B27
Tension Lever Sub Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133
Idler Assembly
I
I
B410
Pinch Arm (A) Assembly
I
I
B414
M Brake S Assembly
I
I
B416
M Brake T Assembly
I
I
B525
LDG Belt
I
I
Содержание FUNAI SYLVANIA Emerson 6309CC
Страница 19: ...1 6 2 T4300DC Fig 1 S 1 S 2 S 2 S 1 ANT DC 13 2V AC 120V 1 REAR CABINET S 1 S 1 S 1 S 1 S 2 S 2 Fig 2...
Страница 21: ...1 6 4 T4300DC Fig 4 CRT CBA S 8 S 8 S 8 ANODE CAP 8 CRT...
Страница 86: ...Packing X16 TAPE S1 X6 X22 X21 X2 X4 X3 A4 S6 S3 S3 S2 S2 PACKING TAPE X1 S4 X7 3 1 7 T4300PEX...
Страница 107: ...Printed in Japan 2002 03 25 HO SC309C F3809U F3809C 6309CC EWC0902 SSC092 T4300UA 4321UB 4301UB 4302UC 4303UD 4304UE...