2-1-1
U27MEN
STANDARD MAINTENANCE
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
H: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel (SP)(D2), Reel (TU)(D2)
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133,B134
Idler Gear, Idler Arm
I
I
B410
Pinch Arm Assembly
I
I
B414
M Brake (SP) Assembly
I
I
B416
M Brake (TU) Assembly
I
I
B525
LDG Belt
I
I
B569
(2 head only)
Cam Holder (F)
I
I
B593
(4 head,
4 head HiFi
only)
Cam Holder (F) Assembly
I
I
Содержание 6319CD/EWC1903
Страница 20: ...1 6 2 T7400DC Fig 1 S 1 S 1 S 1 S 2 1 REAR CABINET ANT 1 REAR CABINET S 1 S 1 S 2 S 1 S 1 Fig 2 ...
Страница 21: ...1 6 3 T7400DC S 5 S 4 S 4 S 5 S 5 S 5 S 5 S 3 S 3 2 TRAY CHASSIS 3 DECK UNIT 4 MAIN CBA S 3 Fig 3 ...
Страница 22: ...1 6 4 T7400DC Fig 4 S 6 S 6 S 6 S 6 5 CRT CRT CBA ANODE CAP ...
Страница 72: ...2 4 8 Z12NDA Fig DM16 41 42 43 L 13 44 45 P 9 Slide Fig DM17 ...
Страница 76: ...Packing 3 1 3 T7400PEX X1 S1 S4 S15 EWC1903 only S3 S3 S2 TAPE TAPE X4 X3 X2 X7 S6 S14 FRONT ...
Страница 93: ...Printed in Japan 2003 02 17 HO 6319CD EWC1903 T7401UB 7403UD ...