Chapter 2 Using the 5071A
Setting the 1pps and Clock Outputs
Operating and Programming Manual
19
7
Press
Enter
and observe the TI counter reading for confirmation.
Positive
values advance the 5071A‘s 1pps in time, while
negative
values retard
it. The resolution of the Slew control is 50 ns. (You will need to make more
than one adjustment if the initial TI counter reading exceeds 500 ms.)
Check the time and date on the 5071A after you‘ve synchronized the 1pps
outputs.
To Set the Clock
Setting the Time
1
Select the CLOCK menu.
2
Set 24-hour time (numeric keys), then press
Enter
.
The clock setting increments immediately
1
.
3
To turn on the LED display, see page 20.
Setting the Date
1
Select the CLOCK menu.
2
Press
twice to bracket the DATE field.
3
Enter the correct Modified Julian Day (MJD) with the numeric keys. (See the
MJD information below and Table 2-1.)
4
Press
Enter
.
The new date is shown in the LCD display.
_________________________
1
You can use the Inc/Dec keys to make small adjustments.
Table 2-1. Modified Julian Days
The Modified Julian Day (MJD)
During the course of configuring and using the 5071A, you‘ll have occasion to set the
date. The 5071A uses the MJD to date log entries as well as tagging the day that a leap
second is to be added or subtracted.
The MJD is a widely accepted method of providing each day with a unique number and
is used with Coordinated Universal Time (UTC). The MJD changes at midnight, and
increments in the 5071A when the clock display reaches 00:00:00. This ensures that the
instrument is correctly synchronized with the MJD.
The easiest way to determine the MJD is to add the number of days between the current
date and a recent known MJD. For example, December 31, 1991 is MJD 48621.
January 5, 1992 was (48621 + 5) or MJD 48626. MJD‘s for December 31 are given in
Table 2-1.
NOTE
Содержание 5071A
Страница 2: ......
Страница 28: ...Preface xxvi Operating and Programming Manual ...
Страница 29: ...____________________________________________ Chapter 1 Getting Started Getting Started ...
Страница 32: ...Chapter 1 Getting Started The 5071A at a Glance 4 Operating and Programming Manual ...
Страница 33: ...Chapter 1 Getting Started The 5071A at a Glance Operating and Programming Manual 5 ...
Страница 34: ...Chapter 1 Getting Started The 5071A at a Glance 6 Operating and Programming Manual 48V OPTION REAR PANEL VIEW ...
Страница 40: ...Chapter 1 Getting Started Performing Basic Tasks 12 Operating and Programming Manual ...
Страница 41: ...____________________________________________ Chapter 2 Using the 5071A Using the 5071A ...
Страница 57: ...____________________________________________ Chapter 3 In Case of Difficulty In Case of Difficulty ...
Страница 97: ...____________________________________________ Chapter 5 Command Reference Command Reference ...
Страница 119: ...Chapter 5 Command Reference Description of SCPI Commands Operating and Programming Manual 91 ...
Страница 136: ...Chapter 5 Command Reference Error Messages Codes 108 Operating and Programming Manual ...
Страница 137: ...____________________________________________ Chapter 6 Specifications Specifications ...
Страница 145: ...____________________________________________ Chapter 7 Installation Installation ...
Страница 162: ...Chapter 7 Installation Cesium Beam Tube Replacement 134 Operating and Programming Manual ...
Страница 163: ...____________________________________________ Appendix A Performance Tests Performance Tests Verifying Specifications ...
Страница 186: ...Appendix A Performance Tests 5071A PERFORMANCE TEST 158 Operating and Programming Manual ...
Страница 187: ...____________________________________________ Appendix B Glossary Glossary ...
Страница 190: ...Appendix B Glossary 5071A Glossary 162 Operating and Programming Manual ...