Sylvania SOQCM850P-47ACH Скачать руководство пользователя страница 3

3

Step 3: Attach the SIDE PANEL [C] to the LEFT FRONT PANEL [D] with 2 KD SCREWS.  Attach 
the other SIDE PANEL [C] to the RIGHT FRONT PANEL [G] with 2 KD SCREWS. See Fig. C. 

fig. C

 

Step 4: Attach the LEFT and RIGHT SIDE PANELS [C, D and G] to the BASE [B] using 4 KD 
SCREWS. (2 screws for each side) See Fig. D

fig. D

Step 5: Place the LOWER FRONT PANEL [F] in between the lower section of 2 FRONT 
PANELS [D and G] and attach with 2 KD SCREWS (1 screw each side). See Fig. E

fig. E

Step 6: Carefully place the INSERT into the unit opening. The front of INSERT should 
be flush with the front of the mantel. Once the INSERT is in place, attach 2 MOUNT-
ING BRACKETS [V] with KD SCREWS (R) onto the bottom of insert. (1 screw for each 
bracket) See Fig. F

fig. F

Step 7: Attach the UPPER FRONT PANEL [E] in between the upper section of the 2 
FRONT PANELS [D and G] with 6 KD SCREWS. (3 screws for each side) See Fig. G

fig. G

Step 8: Attach 2 MOUNTING CLIPS [U] onto the top of INSERT and lock in place with 2 
SHORT KD SCREWS [T]. See Fig. H

fig. H

Step 9: Install the TOP PANEL [A] to the unit as shown and attach with 5 KD SCREWS. 
See Fig. I

fig. I

Step 10: Tighten all KD SCREWS.

Отзывы: