13
8 Maintenance
The Dusty needs very little maintenance.
For the maintenance the unit has to be removed from the process so that the sensor probe and the sensor
insulation (white sleeve) can be cleaned.
Hereby it’s possible to prevent deposit bridges between the sensor rod and the duct wall which could induce
to a function failure or short-circuit.
If particles in the gas are sticky and tend to build up, the cleaning needs to be done more often.
Inside the enclosure maintenance is not needed.
9 Troubleshooting
9.1
No switching of the output signals
1.
Check the power and the connection of the contacts.
2.
Check if there is power on the LED (LED lightens).
3.
Execute the auto-SETUP.
If the sensor is not giving any output signals after the checks 1, 2 and 3, please contact:
Our branch offices OR our distributors OR SWR engineering Messtechnik GmbH.
9.2
No sensor response after the auto-SETUP
1.
Check if the normal process is going on and if there were normal operation conditions during the auto-SETUP.
2.
Check the power and the connection of the signal wiring.
3.
Check if there is no short circuit
•
there is no contact between the sensor probe and the duct wall.
•
the gas is not condensing (because of build up).
•
the dust is not sticky: so there is no build up on the sensor base
which could induce to a bridge between the sensor probe and the duct wall.
EN 071129
Содержание Dusty
Страница 1: ...1 ...
Страница 10: ...10 5 Dimensions Fg 3 Dimensions and structure of the Dusty ...