3. Determine Pipe Size
· Apply lubricant on rubber washers of straight
tube and connecting pipe, then insert into holes.
· Draw lines on pipes as pictured below.
— 2 —
2. Dry Fit Outlet Pipe and Inlet Pipe
·
Fully insert straight tube into cistern flushing outlet
then connect pipe into discharge outlet.
·
Draw lines to mark the finished wall location on each
pipe as pictured below.
1. Install Tank Carrier System
· Before toilet bowl installation, a wood frame and
commercial or residential tank system is required.
· Install according to manufacturer's instructions.
WALL-HUNG TOILET
INSTALLATION INSTRUCTIONS
4. Cut Pipes
·
Measure the distance between both marked lines
on pipe. Take measured distance, deduct from bald
end of pipe and cut pipes as shown below.
·
After cutting, take a file and remove all burrs. Try
and bevel pipe edge.
L1:
The distance between the two lines on the
straight tube.
L2:
The distance between the two lines on the
connecting pipe.
L2
L1
L1 +
¹5⁄16
”
L2
L2 +
¹5⁄16
”
L1