Installation - Details
Suspension
PARASOL Zenith has four mounting brackets for suspension
and are installed using one threaded drop rod in each
mounting bracket (Figure 23). A double threaded rod
with a thread lock should be used if there is substantial
distance between the overhead slab and the unit. A 200
mm threaded drop rod is used for surface mounting.
Threaded drop rods and assembly fitting SYST MS M8
(Figure 22) are ordered separately.
For installation in an existing T-bar system, the product is
stabilised by the T-bar system and in this case it is sufficient
to suspend the product from two brackets (diagonal).
Quick bracket
For an even more efficient and time-saving installation,
we have developed a kit for easier installation. PARASOL Z
QUICK SUSPENSION KIT, consisting of 2 fixed brackets.
The fixed brackets are fastened to the ceiling. The product
can then be pushed into place without the use of tools.
The brackets also feature an integrated fine adjustment of
approx. 50 mm in height. (Figure 24).
Figure 23. Suspension in four brackets with SYST MS M8
Figure 22. Assembly piece SYST MS M8-1, ceiling mount and
threaded rod
50mm
Centring kit
The centring kit can ideally be used on the ceiling system
such as FOCUS E, FOCUS D and similar ceilings with
concealed T-bar system or shadow line.
The kit consists of 6 centring rails that are used to centre
the product in specific suspended ceiling systems. (Figure
25).
Figure 24. Installation with quick bracket
PARASOL Z QUICK SUSPENSION KIT
Figure 25. Centring kit
SYST CENTRING KIT PARASOL
13
23/03/2019 Swegon reserves the right to alter specifications.
PARASOL
Zenith b