
SL-145.OPE
3-3
07/2009
PLACING A CONTAINER ON THE GROUND
1.
Move the sliding jib all the way back (right control backward) until mechanical jib
latches unlock.
2.
Tilt the arm backwards (left control backward). When the container touches the ground,
release the brakes to free the truck for forward movement caused by the container.
3.
Rotate jib all the way till the container touches the ground. Pull away from container and
rotate jib back into the transport position.
WARNING:
1.
DON'T OVER SPEED THE PUMP
1,500
RPM
MAXIMUM.
2.
DON'T DUMP ON UNEVEN GROUND.
Содержание SL-145
Страница 1: ...Model SL 145 Parts and Operations Manual Hoist Serial Number ____________________ ...
Страница 7: ...INTRODUCTION ...
Страница 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Страница 15: ...INSTALLATION ...
Страница 38: ......
Страница 39: ......
Страница 42: ...Page 3 of 7 28JUL09 ...
Страница 43: ...Page 4 of 7 28JUL09 ...
Страница 44: ...Page 5 of 7 28JUL09 ...
Страница 45: ...Page 6 of 7 28JUL09 ...
Страница 46: ...Page 7 of 7 28JUL09 ...
Страница 49: ......
Страница 50: ......
Страница 51: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Страница 54: ...10 05 09 ...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 61: ...OPERATION ...
Страница 66: ...MAINTENANCE ...
Страница 68: ...SL 145 MAI 4 2 07 2009 ...
Страница 80: ...PARTS LIST ...
Страница 81: ...11H80 REV B SL 145 SWAPLOADER HOIST BASE ASS Y 2 1 5 2 3 3 1 ...
Страница 82: ...11H78 REV E SL 145 MAINFRAME SUB ASSEMBLY 11 7 6 1 13 8 12 5 2 12 8 13 6 5 1 7 11 2 17 13 13 16 15 18 19 ...
Страница 83: ......
Страница 84: ......
Страница 92: ...OPTIONS ...