SL-145.OPE
3-1
07/2009
OPERATING INSTRUCTIONS
During all operations of the SwapLoader, the speed of the engine should be maintained at 1,000
to 1,200 RPM, assuming the ratio of the Power Take Off is about 100%.
LOADING A CONTAINER
1.
Engage the P.T.O. (Refer to P.T.O. manual for operation).
2.
Retract the jib (right control lever backward). Then, tilt the arm backward (left control
lever backward).
3.
Make sure the work area in front of the container is clear of people and obstacles. Move
the truck backwards until the hook engages the curved lifting bar of the container.
NEVER EXTEND THE JIB
to reach the proper catching height, rather tilt the arm.
RAISE/UNLOAD
LOWER/LOAD
JIB
RETRACT
EXTEND
LIFT
FRONT
Содержание SL-145
Страница 1: ...Model SL 145 Parts and Operations Manual Hoist Serial Number ____________________ ...
Страница 7: ...INTRODUCTION ...
Страница 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Страница 15: ...INSTALLATION ...
Страница 38: ......
Страница 39: ......
Страница 42: ...Page 3 of 7 28JUL09 ...
Страница 43: ...Page 4 of 7 28JUL09 ...
Страница 44: ...Page 5 of 7 28JUL09 ...
Страница 45: ...Page 6 of 7 28JUL09 ...
Страница 46: ...Page 7 of 7 28JUL09 ...
Страница 49: ......
Страница 50: ......
Страница 51: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Страница 54: ...10 05 09 ...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 61: ...OPERATION ...
Страница 66: ...MAINTENANCE ...
Страница 68: ...SL 145 MAI 4 2 07 2009 ...
Страница 80: ...PARTS LIST ...
Страница 81: ...11H80 REV B SL 145 SWAPLOADER HOIST BASE ASS Y 2 1 5 2 3 3 1 ...
Страница 82: ...11H78 REV E SL 145 MAINFRAME SUB ASSEMBLY 11 7 6 1 13 8 12 5 2 12 8 13 6 5 1 7 11 2 17 13 13 16 15 18 19 ...
Страница 83: ......
Страница 84: ......
Страница 92: ...OPTIONS ...