PREDELIVERY CHECK LIST
SWAPLOADER MODEL SL-145 HOIST INSTALLATION
SL-145.PRE
PAGE 2
07/2009
IV.
HYDRAULICS INSTALLATION
Correct hydraulic oil level in reservoir
Check for leaks
Any abnormal noise during operation:
YES
NO
If yes, explain:
WITH ENGINE OPERATING @ 1000 RPM, RECORD THE FOLLOWING
INFORMATION:
Cycle time for dump mode:
Up
Sec.
Down
Sec.
Cycle time for load/unload mode:
Unload
Sec.
Load
Sec.
Filter
pressure
PSI.
Main pressure, controls in neutral
PSI.
Main relief pressure when extending jib cylinder (bottomed out)___________PSI.
Main relief pressure when extending lift cylinders (bottomed out)___________PSI.
NOTE: Connect pressure gauge to fitting provided on inlet section of Hyd. Control
Valve (Ref. Pt. No. 10P37 fitting on Chassis-Tank Hyd. Circuit Drawing No. 90H90).
V. OPERATION
Jib operates freely in both directions.
Jib cannot be extended or retracted when raised in dump position or when
pivot joint is tilted in unload position. Both safety hooks are fully engaged
when jib is extended.
Parts and operators manual in cab.
Lubricate sliding jib and all grease zerks per installation instructions.
VI. DECALS
All safety decals and product decals installed per Drawing 11H81.
ADDITIONAL COMMENTS:
SEND COMPLETED FORM TO:
SWAPLOADER U.S.A., LTD.
1800
N.E.
BROADWAY
AVENUE
DES
MOINES,
IOWA
50313-2644
RETAIN ONE COPY FOR YOUR FILE.
Содержание SL-145
Страница 1: ...Model SL 145 Parts and Operations Manual Hoist Serial Number ____________________ ...
Страница 7: ...INTRODUCTION ...
Страница 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Страница 15: ...INSTALLATION ...
Страница 38: ......
Страница 39: ......
Страница 42: ...Page 3 of 7 28JUL09 ...
Страница 43: ...Page 4 of 7 28JUL09 ...
Страница 44: ...Page 5 of 7 28JUL09 ...
Страница 45: ...Page 6 of 7 28JUL09 ...
Страница 46: ...Page 7 of 7 28JUL09 ...
Страница 49: ......
Страница 50: ......
Страница 51: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Страница 54: ...10 05 09 ...
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 61: ...OPERATION ...
Страница 66: ...MAINTENANCE ...
Страница 68: ...SL 145 MAI 4 2 07 2009 ...
Страница 80: ...PARTS LIST ...
Страница 81: ...11H80 REV B SL 145 SWAPLOADER HOIST BASE ASS Y 2 1 5 2 3 3 1 ...
Страница 82: ...11H78 REV E SL 145 MAINFRAME SUB ASSEMBLY 11 7 6 1 13 8 12 5 2 12 8 13 6 5 1 7 11 2 17 13 13 16 15 18 19 ...
Страница 83: ......
Страница 84: ......
Страница 92: ...OPTIONS ...