
IMPORTANT
This valve is adjusted for factory testing with
nitrogen at 1000 psig (69 bar) or the rated
pressure if lower than 1000 psig (69 bar).
Packing must be readjusted for service
at higher than test pressure.
Warning:
Packing adjustment may be required
during the service life of the valve to
prevent leakage.
Before servicing any
installed valve you must depressurize the
system, cycle the valve, and purge the valve.
Adjust the packing by turning the packing
bolt clockwise in 1/16‑turn increments until
leak‑tight performance is achieved. Always
verify proper operation upon installation.
40 Series Valve Packing Adjustment
A Swagelok Pre-Engineered Subsystem Fast Loop Module
27
Содержание Fast Loop Module
Страница 51: ...Tornado Model 602 Maintenance Instructions A Swagelok Pre Engineered Subsystem Fast Loop Module 51...
Страница 52: ...Tornado Model 602 Maintenance Instructions A Swagelok Pre Engineered Subsystem Fast Loop Module 52...
Страница 53: ...Tornado Model 602 Maintenance Instructions A Swagelok Pre Engineered Subsystem Fast Loop Module 53...
Страница 54: ...Tornado Model 602 Maintenance Instructions A Swagelok Pre Engineered Subsystem Fast Loop Module 54...
Страница 55: ...A Swagelok Pre Engineered Subsystem Fast Loop Module 55...