background image

1 1

1 1

1 1

1 1

 

 

SVC WIRELESS EXTERNAL DATA INTERFACE 4 CHANNEL USER MANUAL REVISION 1.0  

 

Figure 16 External Data Display After Reference Scan 

This shows that the PAR sensor’s downwelling radiance value was 10440 units during the most recent 
Reference Scan. The “Last Scan” indicates that we have not yet acquired any WEDI-4 sensor data 
associated with a Target Scan since our last Reference Scan. 
 
Now, just prior to acquiring an actual Target Scan, the operator may first press the “Ext Data Scan” 
button, in order to test if the current downwelling radiance is still the same as it was during the most 
recent Reference Scan. This is shown below: 
 

 

Figure 17 External Data Display After Ext Data Scan 

This shows that the current downwelling radiance (“Last Scan Field”) is 10433 units, or 99.9% when 
compared to what it was at the time of the last Reference Scan. So a Target Scan could be quickly 
acquired right now - a new Reference Scan is not required. 
 
The “Last Scan” field is also updated whenever the Target Scan button is pressed. This allows the 
operator to immediately know when a Target Scan must be discarded, because downwelling radiance 
has changed too much. This situation is shown below: 
 

 

Figure 18 External Data Display After Target Scan - Cloud Cover! 

This shows that the target we just acquired had only 8131 downwelling radiance units, or 77.9% when 
compared to what it was during the prior Reference. This Target Scan may have to be discarded, since 
the absolute reflectance calculation from this target data will be incorrect due to the changed lighting 
conditions between the Reference and Target Scan. 
 
In summary: 
 

 

The “Ext Data Scan” button immediately updates the “Last Scan %” field, which may be 
examined just prior to a target scan, in order to know whether conditions are still suitable for 
a new target. 

 

 

The “Target Scan” button also updates the “Last Scan %” field, which may be examined 
after a target scan to judge whether the target scan contains good spectral data, or should be 
discarded. 

Содержание ASM1024-600

Страница 1: ...ata Interface WEDI 4 P N ASM1024 600 USER MANUAL Revision 1 0 29 Firemens Way Poughkeepsie New York 12603 USA Voice 845 471 7007 Fax 845 471 7020 E mail svcinfo spectravista com Copyright 2019 Spectra...

Страница 2: ......

Страница 3: ...IN 20 BOTTOM MOUNT AS SHOWN BELOW 3 CONTROLS AND INDICATORS 4 POWER SWITCH 4 LED AUDIO BEEPER 4 PAIRING WEDI 4 WITH YOUR INSTRUMENT 5 WEDI 4 USAGE STAND ALONE MODE 7 WEDI 4 USAGE PC MODE 9 WEDI 4 REC...

Страница 4: ...g Downwelling Radiance Is Currently Down 3 Percent vs Reference 8 Figure 13 LCD Indicating Downwelling Radiance Is Currently Up 10 Percent vs Reference 8 Figure 14 PC Software WEDI Controls Example 9...

Страница 5: ...ly inject data from the built in Li Cor PAR sensor as well as data from external sensors into the scan data acquired by the spectroradiometer Figure 1 WEDI 4 Top View Showing Built In PAR Sensor Figur...

Страница 6: ...nges in downwelling irradiance and take action to avoid collecting erroneous data The i Series instruments record the external sensor data for each measurement The i Series spectroradiometer operator...

Страница 7: ...4 CHANNEL USER MANUAL REVISION 1 0 Figure 4 i Series External Data Bluetooth Antenna Location For best results the WEDI 4 may be mounted on a tripod using its built in 20 bottom mount as shown below...

Страница 8: ...unit emits a single 1 second beep to indicate that power has been applied and that the firmware has successfully started The LED lights and stays on solid to indicate sufficient battery voltage to run...

Страница 9: ...own below Figure 7 WEDI 4 Unique Bluetooth Address Tag Chassis Bottom The pairing process uses the i Series PC Data Acquisition Software to configure the WEDI 4 Bluetooth address into the i Series ins...

Страница 10: ...g from the WEDI 4 to the i Series instrument Figure 10 LCD Pairing Process Completed Once the pairing is complete press the SAVE SETTINGS button This will cause the i Series instrument to automaticall...

Страница 11: ...yet So the instrument is waiting for the initial reference See below Figure 11 Waiting for the Initial Reference Scan Note that the EXT field will also display OFF if the EXTERN DATA field mentioned...

Страница 12: ...current downwelling radiance is 10 percent greater than at the time that the reference scan was taken Figure 13 LCD Indicating Downwelling Radiance Is Currently Up 10 Percent vs Reference When the EX...

Страница 13: ...noted in any resulting SIG files in the header s external data mask field See the i Series User Manual for more details on external data and SIG file header fields for more information External Data D...

Страница 14: ...as dark at the time that this button is pressed The Ext Data Dark button need not ever be pressed if the WEDI 4 sensors do not require dark current correction When the Ext Data Scan button is pressed...

Страница 15: ...ed right now a new Reference Scan is not required The Last Scan field is also updated whenever the Target Scan button is pressed This allows the operator to immediately know when a Target Scan must be...

Страница 16: ...r turned off and the battery charger disconnected from the mains remove the charging port cap and plug the battery charger into the WEDI 4 charging port Figure 19 WEDI 4 Battery Charging Port Plug the...

Страница 17: ...11 Volts Nominal 9 2 10 2 Volts Low 9 2 Volts Table 1 Battery Voltage vs Charge State The nominal voltage of the battery is 9 6V The WEDI 4 will operate on voltages as low as 8 5V however it is recom...

Страница 18: ...Check using a Voltmeter The voltage level of the WEDI 4 battery may be checked by turning the unit ON and placing a volt meter between pins 2 and 3 of the round SPN 1 connector located on the side of...

Страница 19: ...red screws from the top of the unit and carefully remove the top cover Note that there are wiring harnesses that will still attach the top cover to the lower chassis It is NOT necessary to remove all...

Страница 20: ...d Battery Prepared For Removal The old battery is attached to the enclosure side wall with double sided foam tape Start the process of removing the battery by first carefully separating the old batter...

Страница 21: ...nto the enclosure Be sure to insert the new battery fully into the bottom of the enclosure before gently pressing the new battery into place against the enclosure side wall Reconnect the 2 pin battery...

Страница 22: ...tor as a temperature input This input may alternately be configured to accept any sensor whose DC voltage output is within the range 0 0 to 4 0 volts Contact the factory in order to change the thermis...

Страница 23: ...ry 9 6V 800mAh 7 7 Wh Rechargeable NiMH SVC P N CAB1024 504 Battery Run Time Approx 10 hours Battery Charger 6 12 Cell Smart Charger 700mA SVC P N CHG000051 Battery Charge Time Approx 2 hours Bluetoot...

Страница 24: ...el SPN1 Pyranometer LI COR refers to Li Cor Biosciences Inc Model LI 190 Quantum Sensor SC refers to Switchcraft female connector p n EN3P5FX mate is p n EN3C5MX I O WEDI A D Converter Analog Input Ra...

Страница 25: ...1 2 1 2 1 SVC WIRELESS EXTERNAL DATA INTERFACE 4 CHANNEL USER MANUAL REVISION 1 0 WEDI 4 User Manual Document Revision Sheet Revision Level Section Revised By Date Revision 1 0 All LS 3 1 19 Initial R...

Отзывы: