background image

b. attach Pulleys

Place one Pulley (D) on each Pigtail Lag Screw (B). 

INSTALL WELDED ScREW EyE (A) ON FRONT WALL

Use stud finder to locate solid wood of top plate. Drill 

7/32" (5.5 mm) hole. Screw Welded Screw Eye (A) into 

top plate of front wall (near top of ceiling). 

Diagram 15. 

Single black/yellow 

hoisting rope must face down.

*Note:

 Appearance of Cleat 

(G1) varies by system size. 

Refer to system part number 

for specific Block and Tackle 

Cleat.

TOP PLATE OF FRONT WALL

Front View

STUDS

Diagram 14.

 Top plate of front wall.

Shackle (C)

Single Black/Yellow 

Hoisting Rope (F)

Block and Tackle Cleat (G1)*

7801bSZ 

7802bSZ

7803bSZ

7806

steP 5 continued:  assemble hoisteR system

Front

Wall

Ceiling

Diagram 13.

 Avoid installing Welded Screw Eye above tall 

shelves. See Diagram 21 (Open).

ATTAcH bLOck AND TAckLE (g)
Attach Block and Tackle system (G) to welded Screw 

Eye (A) with Shackle (C). Remove ring from shackle  

like a key ring. Put pin through top of Cleat (G1).  

Put ring back on to secure Shackle (C).

Содержание 7801BSZ

Страница 1: ...d Drill Drill bits 5 32 4 mm 7 32 6 mm 5 16 8 mm Plumb line Pencil Stud finder Stepladder Safety glasses Tape measure Wrench 7 16 11 mm box end or ratcheting wrench Note G Block and Tackle varies by s...

Страница 2: ...Board Back 2 x 6 Mounting Board Block and Tackle G INSTALLATION OVERVIEW STEP 1 Determine Hoister location STEP 2 Install mounting boards STEP 3 Install pigtail lag screws STEP 4 Install rope organiz...

Страница 3: ...ted too far forward boat may not balance or lower onto car STEP 1 DETERMINE HOISTER LOCATION Opened Garage Door Opened Garage Door Opened Garage Door Opened Garage Door Option 1 Above Garage Door Clea...

Страница 4: ...essary for installation in ceiling with exposed rafters In ceilings with exposed rafters system can be installed on raf ters Position Hoister directly above boat to be lifted If installing without mou...

Страница 5: ...istance on mounting boards Mark drill points in the center of the board Drill 5 16 8 mm holes completely through the mounting boards Diagram 4 Mark center to center distance between rafters on mountin...

Страница 6: ...ounting boards Object Width Add 2 50 mm outside Drill 7 32 5 5 mm hole at each outside point MOUNTING BOARD 2 50 mm 2 50 mm Drill Hole Point Drill Hole Point Diagram 8 Install a Pigtail Lag Screw B in...

Страница 7: ...n to mounting board with Lag Bolts I and Washers J IMPORTANT Do not over tighten bolts This can keep Rope Organizer Pulleys L from turning properly Step 4 Install rope Organizer STEP 5 ASSEMBLE hoiste...

Страница 8: ...m part number for specific Block and Tackle Cleat TOP PLATE OF FRONT WALL Front View STUDS Diagram 14 Top plate of front wall Shackle C Single Black Yellow Hoisting Rope F Block and Tackle Cleat G1 78...

Страница 9: ...op Rope to each Webbing Strap E using a figure eight knot Pass free end of rope through the sewn Webbing Strap eye Tie knots below top of object so load can be lifted to ceiling OBJECT CEILING Diagram...

Страница 10: ...below Hoister clear If the load falls it may cause an accident damage to property personal injury or death Tip Use gloves to protect hands WARNING Hang coiled rope where it will not accidentally snag...

Страница 11: ...installed inadequately inspected after installation improperly maintained used in any application for which it was not intended used under load conditions exceeding the rating or other published reco...

Страница 12: ...te and simple to install Easy one person operation with a single control rope Self locking cleat grips instantly if accidentally released Do not use this product for human suspension Tools Needed Dril...

Отзывы: