Standard Operating Procedures
L410 UVP-E20
Document No.:
SOP-L410-1
Page 1 - 4
Rev: 1
Date: JAN 18
Prepared by : LA
Checked by : CLS
All Revisions to the SOP Manual shall be approved by the DGCA. Revised copies
of the SOP Manual shall be sent to all manual holders, who shall replace the
outdated pages (or the complete Manual), with the revised pages. All revisions
shall be entered and dated on the Record of Revisions page.
Revisions to the manual shall be identified by the following:
•
Revision Date.
•
Revision Number.
•
A new List of Effective Pages, which shows the status of each page of the
Manual.
Revisions to the text of the SOP Manual shall have a revision marker set in the
right margin adjacent to the revised text. The marker shall consist of a vertical
line, which encompasses the revised text area. Areas where text is deleted shall
also be annotated with an
“Information Deleted”
statement in
bold
typeface
and
Italics
.
The Operations Manager (or an approved delegate) shall ensure that all revision
record confirmations (Work Order Publications) are returned to the Technical
Records Department, and follow-up action is taken to ensure that the holder of
the applicable manual has received the revision.
Содержание L410 UVP-E20
Страница 5: ......