Standard Operating Procedures
L410 UVP-E20
Document No.:
SOP-L410-1
Page 7- 11
Rev: 1
Date: JAN 18
Prepared by: LA
Checked by : CLS
7.11 Approach Checklist
Carried out approximately 15nm before the airport
7.12 Procedure Turn and Initial Approach
Cross the procedure turn fix in clean configuration at 135 KIAS.
If a complete arrival procedure has been selected via the GPS, the initialapproach phase may
be completed using the GPS for guidance (if the approachis in the database). Raw data must
be monitored.
call out
COMPLETED
PM
ON
PM
ON
PM
SET
PM
CHECKED
Both
Down/Unlocked
PM
COMPLETED
PM
Terrain/EGPWS switch
PAX Briefing
Taxi Lights
Seatbelt Signs
Fuel Transfer / X-feed
Brakes
Reverse Latch
APPROACH
Approach Callouts
PF calls for approach checklist, PM will action the
checklist.
PF:
“Approach Checklist”
Содержание L410 UVP-E20
Страница 5: ......