7
Only use parts provided with, or specified for use
with, the air handler equipment.
The components of this fan coil have been
inspected at the factory and readied for
shipment. Upon receiving the shipment, a visual
inspection of the packaging must be performed.
Care must be taken when handling sheet metal.
Sheet metal parts have sharp edges and could
cause injury.
12 inches of clearance is required around all
sides of the air handler to allow for proper airflow
and servicing.
DO NOT
Use Ethylene Glycol with this system.
Only Propylene Glycol is to be used at prescribed
mixture ratios.
This unit must be connected to a protective
earthing system prior to operation.
DO NOT
remove the grounded connection while power is
being supplied to the Surna air handling
equipment. Doing so presents an electric shock
hazard to users and service personnel.
Care must be taken to ensure the structural
integrity of the supporting members when
mounting these devices. Verify that the load
bearing capacity of any mounting surface is
rated for the load of the air handler.
Adequate clearance shall be provided around
the unit for regular servicing. After installation,
service and maintenance personnel shall be able
to access the power supply, coil connections
and condensate drain.
Do not plug other equipment into the socket
outlet on the chassis exterior. This connection is
meant for the fan module only.
This equipment is not meant for connection to
ducting.
Содержание Surna IsoStream SCMAHV-42
Страница 2: ......
Страница 12: ...12 System Specifications Dimensional and Electrical Data Elevation and Glycol Derating ...
Страница 13: ...13 Cooling Data ...
Страница 15: ...15 ...
Страница 16: ...303 993 5271 info surna com surna com 1780 55th Street Suite A Boulder CO 80301 ...