9
Manual 19“ HVPS-HC Module
19“ HVPS-HC Module R012 Manual | Surface Concept GmbH
4 Device Layout & Operation
4.1 Device Layout
The layout of the 19” HVPS-HC Module R012 is given below.
SHV connector for output of operation
voltage with positive polarity for the first/
second HV channel.
(Must be terminated to GND or to an external
reference potential when using the output
voltage with negative polarity.
Check the specification sheet for the
maximum allowed reference voltage).
SHV connector for output of operation
voltage with negative polarity for the first/
second HV channel.
(Must be terminated to GND or to an external
reference potential when using the output
voltage with positive polarity.
Check the specification sheet for the
maximum allowed reference voltage).
Figure 2: Layout of the 19” HVPS-HC Module R012.
1(+)/2(+)
1(-)/2(-)